Study X · The Federal Dollars Series
The Debt, the Waste and the Tax
The national debt since 1790 and the Congressional Budget Office's path for the next thirty years, with what is wasted and who pays.
On October 1, 2026 the United States owed $40.26 trillion — $117,467 for every resident ($40,260.6 billion ÷ 342.739 million), $94,631 of it to the public ($32,433.8 billion ÷ 342.739 million) and the rest to government accounts, mostly its own trust funds (Treasury, Debt to the Penny). It took the country 192 years to borrow its first trillion dollars (1790 to FY1982, when the debt reached $1.14 trillion) and the last three years to borrow its most recent seven ($33.17 trillion at the end of FY2023 to $40.17 trillion at the end of FY2026; Treasury, Historical Debt Outstanding). The interest alone was $970.1 billion in fiscal 2025, 13.8% of all federal spending and, for the second year, more than the armed forces.
The debt and deficit figures are the Treasury’s and OMB’s own; the projections are CBO’s; the improper-payment estimates are the agencies’ own, as certified to OMB; the tax distribution is CBO’s and the IRS’s. The failed programs are chosen by us, from inspector-general and GAO findings, and each carries its source.
Two hundred and thirty-six years of borrowing
Every war is a step up; the debt was cut to about $34,000 in 1835 and $38,000 in 1836, the only time it was all but repaid; and the three increases that dominate the modern record — the Second World War, the financial crisis and the pandemic — were each followed by a plateau, except the last.
Exhibit 1
Debt per resident has more than quadrupled since 1946, in fiscal 2025 dollars
Source. Treasury, Fiscal Data, Historical Debt Outstanding; OMB Historical Tables, FY2027 edition, Table 10.1; BEA population via FRED. Fiscal years 1790–2026; per resident from 1929, in fiscal 2025 dollars from 1940.
Full sizeMethod. Total public debt outstanding at each fiscal year-end (June 30 to 1976, September 30 since 1977), from Treasury’s Historical Debt Outstanding; the FY2026 figure is September 30, 2026. The 1843 entry appears twice because the fiscal year changed; the later value is used. It is slightly larger than OMB’s “gross federal debt” (which excludes some agency debt and uses accrual values); the two are shown on their own bases and not mixed. Per resident divides by BEA’s annual population (1929 onward; earlier years omitted); FY2026 divides by the January–August 2026 average of Census monthly population (342,739 thousand). Fiscal 2025 dollars use OMB’s GDP price index (Table 10.1, 1940 onward; FY2026 on OMB’s estimate). Current-dollar debt for every year from 1790 is in the table and the CSV, in billions to three decimals, so 1835 ($33,733.05) and 1836 ($37,513.05) show as 0.000.
Exhibit 2
Source. OMB Historical Tables, FY2027 edition (April 2026), Table 7.1, 1940–2025; CBO, The Long-Term Budget Outlook Data: 2026 to 2056 (February 25, 2026), supplemental file 51119, Table 1, saved by hand from cbo.gov, 2026–2056.
Full sizeMethod. Federal debt held by the public and gross federal debt as percentages of GDP, from OMB Table 7.1 for 1940–2025 and CBO’s extended baseline for 2026–2056: current law as of the FY2026 baseline, no recessions, no policy change. The 1946 peak was 106.1% of GDP held by the public; CBO’s path is 105.8% in 2029 and 107.7% in 2030. The Federal Reserve’s holdings (OMB Table 7.1) are in the CSV.
The shape. The debt held by the public was 106.1% of GDP in 1946 and fell, without ever being repaid, to 23% by 1974 as the economy outgrew it. It rose through the 1980s and early 1990s to 48% in 1993, fell to 31.5% by 2001 in the only sustained surpluses of the modern era, was 35.2% on the eve of the financial crisis, 78.9% on the eve of the pandemic, and 99.5% at the end of fiscal 2025. CBO’s baseline — current law, with no recession — takes it to 120% in 2036 and 175% in 2056.
Per resident. The gross debt was $25,177 per resident in 1946 in fiscal 2025 dollars, $13,142 in 1981 and $35,575 in 2000; on October 1, 2026 it was $117,467 in current dollars. In nominal terms it passed $1 trillion in 1982, $10 trillion in 2008, $20 trillion in 2017, $30 trillion in 2022 and $40 trillion in 2026.
What “the public” means. Of the $40.26 trillion, $7.83 trillion is owed by the Treasury to other parts of the government — government accounts, mostly trust funds, which hold their surpluses in Treasury securities. That debt is real to the trust funds and will be redeemed from general revenue as the funds draw down; it is why the trust-fund depletion dates and the debt are the same problem seen from two sides.
The deficits that built it
The last surplus was fiscal 2001. The fiscal 2025 deficit was $1.77 trillion, 5.9% of GDP (OMB Table 1.2) — matched in peacetime before 2009 only by 1983.
Exhibit 3
The government has run a deficit in 52 of the 56 fiscal years since 1970
Source. OMB Historical Tables, FY2027 edition (April 2026), Table 1.1 and Table 10.1. Fiscal years 1901–2025; as a share of GDP from 1940.
Full sizeMethod. Total receipts and outlays, on- and off-budget combined (OMB Table 1.1), over Table 10.1 GDP. 1901–1939 have no GDP series and are given in current dollars only; OMB prints 1913 and 1914 as a deficit of under $0.5 million, left blank here.
The interest
From 2022 the rates turned and the debt did not. Net interest went from $352 billion in FY2021 to $970.1 billion in FY2025 — $2,837 per resident ($970.1 billion ÷ 341.944 million) and more than national defense for the second year.
Exhibit 4
Net interest was 13.8% of federal outlays and 3.2% of GDP in FY2025
Source. OMB Historical Tables, FY2027 edition (April 2026), Table 3.1, share of outlays; CBO, The Long-Term Budget Outlook Data: 2026 to 2056 (February 25, 2026), Table 2, share of GDP 1940–2056, saved by hand from cbo.gov.
Full sizeMethod. Net interest is function 900: interest paid less interest received by trust funds and others. The share of outlays is OMB’s (Table 3.1), charted for 1940–2025; OMB’s estimates for 2026–2031 are in the table and CSV. The share of GDP is CBO’s own series from one file, its historical values (which CBO draws from CBO and OMB data) for 1940–2025 and its extended-baseline projection for 2026–2056, so no seam joins two sources. OMB’s shares of GDP (net interest over Table 10.1 GDP) are in the CSV. Per resident divides by BEA’s annual population. National defense (function 050) and the other large functions are in the CSV, $m current.
Exhibit 5
Gross interest rose from $522.8 billion in FY2020 to $1.22 trillion in FY2025
Source. Treasury, Fiscal Data, Average Interest Rates on U.S. Treasury Securities; Interest Expense on the Public Debt Outstanding. Average rates monthly, January 2001 to August 2026; gross interest fiscal years 2011–2025 and FY2026 to August.
Full sizeMethod. Average interest rates are Treasury’s monthly averages for total interest-bearing debt and total marketable debt. Gross interest is Treasury’s monthly interest expense on the public debt outstanding, summed by fiscal year across public issues and Government Account Series, so it includes what the Treasury pays its own trust funds; each fiscal year sits in its September row. FY2010 is partial and omitted; the August 2026 row holds FY2026 to August (October–August), which is not charted.
The next thirty years, by the Congressional Budget Office
On CBO’s path, everything but Social Security, Medicare and interest is flat or shrinks relative to the economy. Revenues rise, but not enough.
Exhibit 6
Social Security, Medicare and interest take spending to 27.9% of GDP by 2056
Source. CBO, The Long-Term Budget Outlook Data: 2026 to 2056 (February 25, 2026), supplemental file 51119, Table 1, saved by hand from cbo.gov. 2026–2056.
Full sizeMethod. CBO’s extended baseline: current law as of the FY2026 baseline, no recessions, no policy change. Spending is stacked by category, Social Security, Medicare (net of premiums and other offsetting receipts), Medicaid with CHIP and marketplace subsidies, other mandatory, discretionary and net interest; the line is revenues. Noninterest spending plus net interest equals total spending in every year (checked when the site is built). The revenue components and the debt are in the CSV.
The arithmetic. In 2026 the government spends 23.3% of GDP and collects 17.5%; in 2056, on CBO’s path, it collects 18.8%. Interest alone rises from 3.3% of GDP to 6.9% — larger than Medicare (net of premiums) from 2028 and than Social Security from 2047, when it becomes the largest category of spending in CBO’s projection — and the deficit from 5.8% to 9.1%. The debt held by the public reaches 175% of GDP; gross debt, 190%.
The trust funds. The 2026 Trustees reports (June 9, 2026), as summarized by the Committee for a Responsible Federal Budget, put the depletion of Social Security’s retirement fund at 2032, when benefits would be cut 22% under current law; the combined retirement and disability funds at 2034 (17% cut); and Medicare’s Hospital Insurance fund at 2033 (11% cut in hospital payments). The 75-year shortfall for Social Security is 4.42% of taxable payroll, 1.5% of GDP, up 16% in a year, from 3.82% (CRFB).
The tax: where the money comes from, and from whom
Exhibit 7
Corporate income taxes fell from 32% of receipts in 1952 to 8.6% in FY2025
Source. OMB Historical Tables, FY2027 edition (April 2026), Table 2.1 and Table 2.5; Table 1.1 and Table 10.1. Fiscal years 1934–2025, with OMB estimates to 2031; as a share of GDP 1940–2025.
Full sizeMethod. Receipts by source from OMB Table 2.1 (individual income taxes, corporation income taxes, social insurance and retirement receipts, excise taxes, other) and Table 2.5 (customs duties, estate and gift taxes and miscellaneous receipts, which make up “other”; Table 2.5 begins in 1940, so 1934–1939 carry “other” whole). Each source is shown as a share of total receipts, 1934–2031 with OMB’s estimates from 2026, and as a share of GDP, 1940–2025: its share of receipts times total receipts as a percent of GDP (Tables 1.1 and 10.1). Dollar amounts ($m) are in the CSV.
The long composition. Individual income taxes were 51% of receipts in FY2025 and payroll taxes 33%. The payroll tax — flat, capped, paid from the first dollar of wages — is the second-largest source, and for the four lower fifths of the income distribution it takes more than the income tax (CBO, 2022: 8.8% against 3.1% for the middle fifth).
The tariff year. Customs duties were $77.0 billion in FY2024 and $194.9 billion in FY2025 — 3.7% of receipts ($194.9 billion ÷ $5,236.4 billion), the largest share since 1941. In February 2026 the Supreme Court held, 6–3, that the International Emergency Economic Powers Act did not authorize most of the tariffs (Learning Resources, Inc. v. Trump, decided February 20, 2026; CRS), and the Treasury began refunding them (customs refunds were $7.5 billion in all of FY2025), with net customs receipts negative in May, June and July 2026 (June: −$25.6 billion). Net customs receipts through August were $167.3 billion, about the same as a year earlier ($165.2 billion through August 2025).
Exhibit 8
Customs refunds reached $125.2 billion in FY2026 through August
Source. Treasury, Monthly Treasury Statement, Table 4 (Receipts of the United States Government), customs duties, via Fiscal Data. Monthly, March 2015 to August 2026.
Full sizeMethod. Customs duties by month: gross receipts, refunds and net (gross less refunds), with net receipts for the fiscal year to date. FY2026 refunds through August are the August fiscal-year-to-date refund total, $125,224,590,881.64; FY2025 refunds, $7,491,734,828.79. Dollars to the cent are in the CSV.
Exhibit 9
In tax year 2023 the top 1% of returns paid 38.4% of individual income tax
| Tax year 2023, by return | AGI above ($) | Share of AGI (%) | Share of income tax (%) | Average rate (%) |
|---|---|---|---|---|
| Top 1% | 675,602 | 20.6 | 38.4 | 26.3 |
| Top 5% | 272,209 | 36.4 | 59.3 | 23.0 |
| Top 10% | 187,608 | 47.6 | 70.5 | 20.9 |
| Top 25% | 105,604 | 68.5 | 86.3 | 17.8 |
| Top 50% | 53,801 | 87.7 | 96.7 | 15.6 |
| Bottom 50% | 12.3 | 3.3 | 3.7 |
Source. IRS Statistics of Income, tax year 2023, as summarized by the Tax Foundation, “Who Pays Federal Income Taxes? Tax Year 2023” (April 2026). Tax year 2023.
Full sizeMethod. Individual income tax only, by return, unadjusted: 153.1 million returns, $15.2 trillion of adjusted gross income (AGI), $2.14 trillion of tax. Not comparable with CBO’s distribution of all federal taxes by household (Exhibit 10).
Exhibit 10
The top 1%’s average federal tax rate was 31.5% in 2022, against 35.1% in 1979
Source. CBO, The Distribution of Household Income, 2022 (January 2026), supplemental Table 9, saved by hand from cbo.gov. 1979–2022.
Full sizeMethod. All federal taxes, including payroll, corporate and excise, allocated to households, as a share of income before transfers and taxes, for four income groups and all households. CBO allocates employer payroll taxes to workers and corporate taxes to owners of capital and workers, and ranks households by income before transfers and taxes, adjusted for size. Every group CBO publishes, with the rate by tax, is in 10-07-cbo-average-federal-tax-rates-1979-2022.csv.
Counting every federal tax, the top 1% of households paid 27.3% of all federal taxes on 17.8% of income before transfers and taxes in 2022; the highest fifth paid 70.2% of taxes on 55.8%; the lowest fifth paid an average rate of 1.4%, with a negative income-tax rate offset by payroll and other taxes (CBO). On the income tax alone, the bottom half of returns paid 3.3% (IRS data, tax year 2023, as summarized by the Tax Foundation).
The waste: what the government says it lost
“Improper payments” are what agencies themselves estimate they paid wrongly — to the wrong person, in the wrong amount, or without the documentation to know. Not every improper dollar is a lost dollar; it is nonetheless the only government-wide number there is.
The FY2025 estimate, across 64 programs, is $543 per resident ($185.8 billion ÷ 341.944 million); since reporting began in 2003 the total is about $3.02 trillion ($2,984 billion for FY2004–2025 and GAO’s $35 billion for FY2003; PaymentAccuracy.gov; GAO).
Exhibit 11
Agencies reported $185.8 billion of improper payments in FY2025, up from $161.5 billion
Source. PaymentAccuracy.gov (OMB), FY2025 dataset, “All Program Results”. Fiscal years 2004–2025.
Full sizeMethod. Improper and unknown payments by program and fiscal year, summed by year; the rate is improper payments over the outlays of the programs that report. The totals match GAO’s published government-wide figures to within rounding. FY2003 is GAO’s $35 billion (not charted); with it the total since 2003 is about $3.02 trillion ($2,984 billion + $35 billion), GAO’s “about $3 trillion”. Not every improper payment is a loss: GAO’s “monetary loss” figures are lower, and underpayments are included.
Exhibit 12
Medicaid had the largest improper-payment estimate in FY2025: $37.4 billion
Source. PaymentAccuracy.gov (OMB), FY2025 dataset, “All Program Results”. Fiscal year 2025.
Full sizeMethod. The sixteen largest FY2025 estimates of improper and unknown payments, with each program’s improper-payment rate (improper and unknown payments over the program’s outlays) and its outlays.
GAO estimates that $100–135 billion of pandemic unemployment benefits was paid to fraud (11–15%); the FY2021 improper-payment estimate for unemployment insurance alone was $78.1 billion. The SBA Inspector General identified $200 billion of potentially fraudulent PPP and EIDL loans and grants (June 2023), of $1.2 trillion disbursed: 8% of PPP, 33% of EIDL. By MedPAC’s estimate, Medicare will pay Medicare Advantage plans $76 billion in 2026 above the cost of the same people in traditional Medicare — 14%, from favorable selection and coding. By the IRS’s estimate, the gross tax gap for tax year 2022 — tax legally owed and not paid on time — is $696 billion; $606 billion after late payments and enforcement. 85% of tax is paid voluntarily and on time (IRS).
What is recoverable. GAO’s annual duplication-and-overlap reports have, by its count, produced $774.3 billion in financial benefits since 2011 from recommendations Congress and agencies acted on, with about $100 billion more identified and open (GAO-26-108505, May 2026). That is a measure of the waste that is found and fixed; against a budget of $7.01 trillion a year (FY2025 outlays, OMB Table 1.1) it is under 1% a year ($774.3 billion over the sixteen years 2011–2026 is $48.4 billion a year, 0.69% of $7,011.1 billion), and the improper-payment estimate alone is 2.7% of outlays ($185.8 billion ÷ $7,011.1 billion).
The programs that failed
Twenty-four cases, chosen for the quality of the finding rather than the size of the number: programs canceled after large spending, programs that missed the goal they were given, and programs whose losses the government has measured. Each row carries its cost as the source states it, or none where the source states none — these are not comparable figures and are not summed — and its outcome.
Exhibit 13
Twenty-four programs that were canceled, missed their goal or measured their losses
| Program | Years | Cost ($bn, as reported) | What happened | Source |
|---|---|---|---|---|
| Canceled or written off | ||||
| Afghanistan reconstruction | 2002–2021 | 148 | $148B appropriated, about 60% for Afghan security forces that dissolved in August 2021; SIGAR identified $26–29B lost to waste, fraud and abuse and $7.1B of equipment left behind. | SIGAR, final report (December 2025), as reported by Defense One |
| California high-speed rail | 2009– | 4 | The $4B federal grant was terminated in July 2025 after the FRA found it could not deliver its early operating segment by 2033; estimated cost rose from $33B (2008) to $89–128B; 171 miles under construction in the Central Valley, no train running. | ABC7 / Associated Press, July 17, 2025 |
| Constellation-class frigate | 2020–2025 | 3 | Twenty ships planned on a proven Italian design; redesigned until, in GAO’s words, the frigate “now bears little resemblance to the parent design”, three years late and overweight. Canceled November 2025 with two hulls half-built; $3B remains to finish them and settle the yard. | Defense News, November 26, 2025 |
| Superconducting Super Collider | 1989–1993 | 1.57 | Terminated by Congress on October 28, 1993, after about $1.57B was spent, when the projected cost had risen from $5.9B (1989) to between $11B and $13B. | DOE Office of Inspector General, DOE/IG-0389 (April 1996) |
| Iraq reconstruction | 2003–2012 | The Special Inspector General for Iraq Reconstruction’s final report (2013) counted $60B spent; many projects were never completed or were abandoned by the Iraqi government. | SIGIR, Learning From Iraq (March 2013) | |
| Army Future Combat Systems | 2003–2009 | A networked family of manned and unmanned vehicles; about $18B spent with no vehicle fielded. | GAO, Defense Acquisitions: Assessments of Selected Weapon Programs (GAO-09-326SP) | |
| Expeditionary Fighting Vehicle | 1996–2011 | Marine Corps amphibious vehicle; some $3B spent in development. | GAO, Defense Acquisitions: Assessments of Selected Weapon Programs (GAO-09-326SP) | |
| Yucca Mountain repository | 1987–2010 | About $15B spent studying and licensing the nation’s nuclear-waste repository before the administration withdrew the license application in 2010. | GAO-11-229 (April 2011) | |
| MOX fuel fabrication facility | 2007–2018 | Built at the Savannah River Site to dispose of surplus weapons-grade plutonium; construction began in FY2007 at an estimated $4.8B; by FY2016 the estimate was about $17.2B, with operations as late as 2048. NNSA terminated the contract in October 2018. | DOE Office of Inspector General, DOE-OIG-20-16 (December 2019) | |
| Solyndra loan guarantee | 2009–2011 | A $535M Energy Department loan guarantee to a solar-panel maker that went bankrupt in 2011. The loan program as a whole has since returned more in interest than it lost, which is the counter-case. | DOE, Energy Dominance Financing portfolio performance; GAO-15-438 | |
| Missed the goal | ||||
| F-35 Joint Strike Fighter | 2001– | 2,000 | Lifetime cost over $2 trillion; $1.6 trillion of it sustainment. GAO (June 2026): mission-capable rate fell from 67% to 44% between FY2021 and FY2025, full-mission-capable from 38% to 25%, with incentive fees paid “for performance that did not align with service requirements”. | GAO-26-108113 (June 11, 2026); GAO-24-106703 (April 2024) |
| VA electronic health record | 2018– | 48 | Estimated at $10B over ten years in 2018; VA’s own estimate is now about $48B ($37B to deploy through 2031 plus $11B to sustain); it went live at 11 sites in 2026. GAO: 4 of 18 recommendations implemented. | Military Times, September 3, 2026 |
| Zumwalt-class destroyer | 1998– | 23.1 | Up to thirty-two ships planned, three built; the guns they were built around were never supplied with ammunition after the round’s projected price reached at least $800,000. | CRS, RL32109 (December 5, 2025) |
| Healthcare.gov launch | 2010–2014 | 0.8 | The federal insurance marketplace failed on launch in October 2013 and was rebuilt within months; HHS’s Inspector General found 60 contracts with an original estimated value of $1.7B; nearly $800M obligated and nearly $500M paid by February 2014. | HHS OIG, OEI-03-14-00230 (January 2015) and OEI-03-14-00231 (August 2014) |
| 2010 Census handheld computers | 2006–2008 | 0.596 | Handhelds built to replace paper for the door-to-door count failed in testing; the Census Bureau reverted to paper for the follow-up in 2008. The contract was awarded at up to $596M; by June 2008 the contractor estimated about $1.3B and the government’s independent estimate was about $726M (GAO). | GAO-08-550T (March 2008); GAO-08-886T (June 2008) |
| Littoral Combat Ship | 2005– | 35 ships procured through FY2019 (CRS); USS Fort Worth was decommissioned in July 2026 after nearly fourteen years of service. | CRS, RL33741 (December 17, 2019); The Defense Post, July 31, 2026 | |
| Pentagon financial audit | 2018–2025 | Eight consecutive failed audits of $4.65 trillion in assets; 26 material weaknesses in FY2025; the only one of 24 major agencies never to pass. Target for a clean opinion: 2028. | Defense News, December 19, 2025 | |
| NASA Constellation and SLS | 2005– | Constellation was canceled in 2010 after about $9B; its successor, the Space Launch System, has a cost NASA’s Inspector General puts above $4B a launch. | NASA OIG, NASA’s Management of the Artemis Missions (IG-22-003, November 2021) | |
| Job Corps | 1964– | Residential job training. The Labor Department’s 2025 transparency report: 38.6% graduation rate, $80,285 per student per year, $155,601 per graduate, $16,695 average post-program earnings. DOL paused the centers in May 2025. | DOL news releases, April 25, 2025 (transparency report) and May 29, 2025 (pause) | |
| Head Start | 1965– | HHS’s own randomized Head Start Impact Study (2010, 2012) found the cognitive gains of the program year had faded by third grade; FY2025 improper payments $1.2B. Defenders cite long-run health and attainment effects in other studies. | HHS/ACF, OPRE Report 2012-45 (December 2012); PaymentAccuracy.gov, FY2025 | |
| Measured losses | ||||
| PPP and EIDL loans | 2020–2022 | 200 | The SBA Inspector General identified $200B in potentially fraudulent loans and grants out of $1.2T disbursed — 8% of PPP and 33% of EIDL; by June 2023, $399M had been seized or forfeited, $509M ordered in restitution, and nearly $30B of EIDL funds seized or returned. | SBA OIG, Report 23-09 (June 27, 2023) |
| Pandemic unemployment insurance | 2020–2023 | 100–135 | GAO estimates $100–135B of pandemic unemployment benefits was paid to fraud — 11–15%; the FY2021 improper-payment estimate for UI alone was $78.1B. | GAO-23-106696 (September 2023); PaymentAccuracy.gov |
| Medicare Advantage | 2006– | 76 | MedPAC (March 2026): Medicare pays plans about 14% more than the same beneficiaries would cost in traditional Medicare — $76B in 2026, from favorable selection (11%) and coding intensity (4%). Separately: $23.7B of improper payments in FY2025. | MedPAC, March 2026; PaymentAccuracy.gov, FY2025 |
| Shuttered Venue Operators Grant | 2021–2022 | 10.1 | The highest improper-payment rate among FY2025 estimates: 68.9% of the program’s payments, $10.1B. | PaymentAccuracy.gov, FY2025 dataset |
Source. Inspector-general, GAO, CRS and agency findings and press reports, cited row by row; the firm’s own selection. SIGIR’s final report (Iraq), the Labor Department’s releases (Job Corps) and GAO-15-438 (Solyndra) could not be retrieved.
Full sizeMethod. The program list is editorial. Selection favored cases with an inspector-general, GAO or CBO finding and a stated cost; the costs are not comparable and are not summed. Each cost is as its cited source states it: appropriations (Afghanistan); the federal grant terminated (California rail); the remaining cost to finish and settle (Constellation); spending at termination (Super Collider); procurement of the three ships ($9,450.8M and $4,342.4M) plus about $9.3B of research and development (Zumwalt, CRS); lifetime cost (F-35); VA’s own estimate to deploy and sustain (VA record); the not-to-exceed value at award (Census handhelds; the contractor’s June 2008 estimate was about $1.3B against MITRE’s independent $726M); obligations to February 2014 (Healthcare.gov); potentially fraudulent loans and grants (PPP and EIDL); GAO’s estimated range of fraud (pandemic unemployment insurance); MedPAC’s 2026 estimate of payments above traditional Medicare (Medicare Advantage); the FY2025 improper-payment estimate (Shuttered Venue grants). A blank cost is one the cited source does not state: the Pentagon audit’s $4.65 trillion is assets audited, not a cost; GAO-11-229’s $15.4 billion for Yucca Mountain is liabilities; and the older cases’ costs in the text (Iraq, Future Combat Systems, the Expeditionary Fighting Vehicle, Yucca Mountain’s $15B spent, NASA Constellation, Solyndra) were not confirmed in a retrieved source (October 5, 2026). The F-35 and the Pentagon audit are included as the largest instances of a program and an institution not meeting a stated standard, not as “failed” weapons or a failed department. The counter-case is given where one exists (Solyndra’s loan portfolio, Head Start’s long-run studies). Rows are grouped by category and ranked by cost within each.
The argument
The debt is the one subject in public finance on which both parties have been right and neither has acted.
The case that spending is the problem: a government that runs a deficit nearly every year and pays $186 billion a year wrongly, by its own count. Federal spending was 23.1% of GDP in 2025 against a fifty-year average of 21.15% (the mean of fiscal 1976–2025, OMB Tables 1.1 and 10.1), and on CBO’s path every point of the increase to 2056 is Social Security, Medicare and interest. The debt held by the public has grown faster than the economy in eighteen of the twenty-five years since 2001 (OMB Table 7.1), under both parties, and the interest on it now exceeds the defense budget. On the government’s own estimate it paid $185.8 billion wrongly in FY2025 and about $3.02 trillion since 2003 ($2,984 billion + $35 billion); in the pandemic programs alone there was an estimated $100–135 billion of unemployment fraud (GAO) and $200 billion of potentially fraudulent SBA loans and grants (SBA OIG); Medicare pays private plans $76 billion a year more than it would spend on the same people in traditional Medicare (MedPAC, 2026). The program record is the same: $148 billion in Afghanistan (SIGAR, via Defense One), a medical-records system now estimated by the VA at $48 billion (Military Times), a frigate that, in GAO’s words, “now bears little resemblance to the parent design”, a repository and a fuel plant abandoned.
Taxes are not low at the top: the top 1% paid 27.3% of all federal taxes in 2022, up from 14.1% in 1979 (CBO), and the income tax is paid almost entirely by the top half of filers (96.7%, tax year 2023; IRS data via the Tax Foundation). Revenue is at its long-run share of GDP (17.3% in 2025 against a fifty-year mean of 17.32%, fiscal 1976–2025); spending is not.
The case that revenue is the problem: a country that cut taxes in every expansion and borrowed the difference. Revenues were 17.3% of GDP in 2025 (OMB Table 1.2), below the 20.0% of 2000 and below what every other large rich country collects. The average federal tax rate across all households was 20.6% in 2022 against 22.4% in 1979; the top 1%’s rate fell while their share of income rose from 9.0% to 17.8% (CBO). The tax gap — $696 billion a year that is owed under existing law and not paid on time (IRS, tax year 2022) — is nearly four times the improper-payment estimate ($696 billion ÷ $185.8 billion), and the IRS that collects it lost about 30% of its workforce, 31,273 employees, between January 2025 and January 2026 (28% net of new hires; TIGTA, June 2026).
The spending that grows is not waste: it is the retirement and health care of a population whose over-65 share rises from 18.7% in 2025 to 23.5% by 2055 (Census Bureau, 2023 projections: 63.3 million of 338.0 million, and 85.1 million of 362.5 million), promised under laws no Congress has repealed. Cutting the agencies that audit, collect and check — as 2025 did — raises the waste it is meant to cut.
The record supports an uncomfortable version of both. The deficit is structural: it was there in 2025 with no war and no recession, and it is the gap between a tax system that collects 17–18% of GDP and a set of promises that cost 23% and rising. The arithmetic admits only three instruments — the retirement and health promises, the tax rate on the broad middle, and the interest rate the country cannot choose — and the eighty-five years since 1940 show that the debt fell only when growth outran the promises or the promises were taxed for. The next thirty years, on the government’s own forecast, offer neither unless someone decides.
Where this joins the series
Who Pays and Who Gets shows the FY2025 dollars flowing from each tax to each recipient, with borrowing as the balancing line; this study shows how that line accumulated and where it is going. Every Dollar of War is the companion: it traces the defense and veterans lines, and the interest that now exceeds the defense line is traced here to its source. Every Federal Job counts the people who collect, check and audit, whose numbers fell in 2025.
What we could not verify
- CBO’s files were saved by hand from cbo.gov on October 5, 2026, because the site refused automated requests; every CBO figure here was checked against them cell by cell.
- Program costs for the older cases (Future Combat Systems, the Expeditionary Fighting Vehicle, Yucca Mountain, NASA’s Constellation, Solyndra) are the figures commonly cited from GAO and CBO reports of their time and were not re-derived from primary documents in this study; their cost cells are left blank. GAO-09-326SP (March 2009), cited for Future Combat Systems and the Expeditionary Fighting Vehicle, predates both cancellations, so their dates and reasons are not given. Afghanistan is as Defense One reported SIGAR’s final report; the Job Corps figures are from the Labor Department’s release of April 25, 2025, which could not be retrieved; the Iraq total is from SIGIR’s final report, whose published copy could not be opened.
- Not used for want of a source: the Iraq “at least $8 billion wasted”; the MOX plant’s $7.6 billion spent and 70% complete (the report cited for them, GAO-18-154, is a different report); the Super Collider’s $2 billion and $4.4 billion (its Inspector General gives $1.57 billion and $5.9 billion); the Zumwalt’s $7.5 billion a ship; the Littoral Combat Ship’s $220 million and $500 million a ship; Yucca Mountain’s damages; the annual budgets of Job Corps and Head Start; the VA record’s 2023 pause; the $900 billion of pandemic unemployment benefits paid; the Littoral Combat Ship’s mission modules and early retirements; the Job Corps injunction and FY2026 funding; a proposal to retire SLS after Artemis III; the Expeditionary Fighting Vehicle’s 2011 cancellation, reliability failures and replacement; Future Combat Systems’ 2009 cancellation, its fourteen vehicles and the Ground Combat Vehicle’s 2014 cancellation; the Super Collider’s fourteen miles of tunnel; the claims that the 2001, 2003, 2017 and 2025 tax laws were each financed by borrowing, that the 2025 deficit was run at full employment and that improper payments are mostly documentation error; why some programs do not report improper payments; and the share of miscellaneous receipts from Federal Reserve remittances.
- The cumulative improper-payment figure of $3.02 trillion includes years in which the set of reporting programs changed, and overlapping estimates for the pandemic programs; GAO’s own cumulative statement is “about $3 trillion”.
- Trust-fund figures are from the CRFB summary of the 2026 Trustees reports; the Social Security report was not retrieved. The Hospital Insurance depletion year, 2033, is confirmed in the Medicare Trustees Report.
- “Every other large rich country” in the argument refers to OECD revenue statistics not retrieved for this page; the comparison is general-government, not federal.
- The Supreme Court’s tariff decision is cited from the Congressional Research Service’s account; the opinion itself was not retrieved.
Sources
- Treasury, Fiscal Data, Historical Debt Outstanding (1790–FY2026)
- Treasury, Fiscal Data, Debt to the Penny (October 1, 2026)
- Treasury, Fiscal Data, Interest Expense on the Public Debt Outstanding, monthly, May 2010–August 2026
- Treasury, Fiscal Data, Average Interest Rates on U.S. Treasury Securities, monthly
- Treasury, Monthly Treasury Statement, Table 4 (Receipts of the United States Government), via Fiscal Data, March 2015–August 2026
- OMB, Historical Tables, FY2027 Budget (April 2026)
- OMB, Table 1.1, Summary of Receipts, Outlays, and Surpluses or Deficits, 1789–2031
- OMB, Table 1.2, Summary of Receipts, Outlays, and Surpluses or Deficits as Percentages of GDP, 1930–2031
- OMB, Table 2.1, Receipts by Source, 1934–2031
- OMB, Table 2.5, Composition of “Other Receipts”, 1940–2031
- OMB, Table 3.1, Outlays by Superfunction and Function, 1940–2031
- OMB, Table 7.1, Federal Debt at the End of Year, 1940–2031
- OMB, Table 10.1, Gross Domestic Product and Deflators Used in the Historical Tables, 1940–2031
- BEA, resident population, annual (B230RC0A052NBEA), via FRED
- Census, monthly population (POPTHM), ALFRED vintage of October 3, 2026
- CBO, The Long-Term Budget Outlook Data: 2026 to 2056 (February 25, 2026), with supplemental file 51119-2026-02-25-LTBO-Budget.xlsx, Table 1, Summary Data for CBO’s Extended Baseline Projections, and data file 62044-2026-LTBO.xlsx, Table 2, Debt and Deficits (saved by hand from cbo.gov)
- CBO, The Distribution of Household Income, 2022 (January 2026), supplemental data, Tables 9, 10 and 12 (saved by hand from cbo.gov)
- Tax Foundation, “Who Pays Federal Income Taxes? Tax Year 2023” (IRS Statistics of Income), April 2026
- IRS, “IRS releases 2022 tax gap projections” (IR-2024-262, October 10, 2024): gross $696 billion, net $606 billion
- TIGTA, Snapshot Report: Status of the IRS’s Workforce as of January 2026 (2026-IE-R009), June 9, 2026
- Census Bureau, 2023 National Population Projections, main series, Table 2: Projected Population by Age Group and Sex
- Executive Order 14257, Regulating Imports With a Reciprocal Tariff, April 2, 2025 (Federal Register document 2025-06063)
- CRS, Legal Sidebar LSB11398, on Learning Resources, Inc. v. Trump (decided February 20, 2026), February 23, 2026
- PaymentAccuracy.gov (OMB), FY2025 improper payments dataset, “All Program Results” (program estimates FY2004–FY2025)
- PaymentAccuracy.gov, resources
- GAO, Improper Payments: Fiscal Year 2025 Estimates (GAO-26-108694), April 27, 2026
- GAO, 2026 Annual Report: Additional Opportunities to Reduce Fragmentation, Overlap, and Duplication (GAO-26-108505), May 12, 2026
- CRFB, “Social Security and Medicare Trustees Release 2026 Reports”, June 9, 2026
- Medicare Trustees, 2026 Annual Report
- GAO, Unemployment Insurance: Estimated Amount of Fraud During Pandemic Likely Between $100 Billion and $135 Billion (GAO-23-106696), September 2023
- SBA Office of Inspector General, Report 23-09, COVID-19 Pandemic EIDL and PPP Loan Fraud Landscape, June 27, 2023
- MedPAC, March 2026 Report to the Congress, press release
- Defense One, on SIGAR’s final report on U.S. reconstruction in Afghanistan, December 2025
- SIGIR, Learning From Iraq: A Final Report from the Special Inspector General for Iraq Reconstruction, March 2013 (the published copy could not be opened)
- GAO, Defense Acquisitions: Assessments of Selected Weapon Programs (GAO-09-326SP), March 2009
- Defense News, “US Navy nixes Constellation frigate program after two ships half built”, November 26, 2025
- CRS, Navy Littoral Combat Ship (LCS) Program: Background and Issues for Congress (RL33741), December 17, 2019
- The Defense Post, “USS Fort Worth decommissioned”, July 31, 2026
- CRS, Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress (RL32109), December 5, 2025
- GAO, F-35 Sustainment (GAO-26-108113), June 11, 2026
- GAO, F-35 Joint Strike Fighter (GAO-24-106703), April 15, 2024: lifetime cost over $2 trillion
- Defense News, “Pentagon fails financial audit for 8th year in a row”, December 19, 2025
- Military Times, “VA said electronic health record modernization would cost $10 billion. Now it’s $48 billion”, September 3, 2026
- HHS Office of Inspector General, Federal Marketplace: Inadequacies in Contract Planning and Procurement (OEI-03-14-00230), January 2015
- HHS Office of Inspector General, An Overview of 60 Contracts That Contributed to the Development and Operation of the Federal Marketplace (OEI-03-14-00231), August 2014
- ABC7 / Associated Press, “Trump administration pulls $4B in federal funding for California high-speed rail”, July 17, 2025
- GAO, Commercial Nuclear Waste: Effects of a Termination of the Yucca Mountain Repository Program (GAO-11-229), April 2011
- DOE Office of Inspector General, Audit Report on Subcontract Administration at the Mixed Oxide Fuel Fabrication Facility (DOE-OIG-20-16), December 2019
- DOE Office of Inspector General, Summary Audit Report on Lessons Learned from the Superconducting Super Collider Project (DOE/IG-0389), April 1996
- DOE, Energy Dominance Financing, portfolio performance (formerly the Loan Programs Office portfolio)
- GAO, Solyndra loan guarantee (GAO-15-438) (not retrieved)
- NASA Office of Inspector General, NASA’s Management of the Artemis Missions (IG-22-003), November 15, 2021
- GAO, 2010 Census testimony (GAO-08-550T), March 5, 2008
- GAO, 2010 Census testimony (GAO-08-886T), June 12, 2008
- U.S. Department of Labor, Employment and Training Administration, news release on the Job Corps transparency report, April 25, 2025 (not retrieved: dol.gov refused automated requests)
- U.S. Department of Labor, news release on the Job Corps pause, May 29, 2025 (not retrieved: dol.gov refused automated requests)
- HHS/ACF, Third Grade Follow-up to the Head Start Impact Study (OPRE Report 2012-45), December 21, 2012
Read next
- The Interest Bill What the federal government pays to carry its debt, what makes it grow, and which levers stop it.
- Five Thousand Dollars Each