The Capital Region

Every Impervious Acre

Runoff from roofs, roads and parking lots under stormwater permits; developed land’s nitrogen rose from 27.5 million lb a year in 1985 to 40.1 million in 2025.

12 min read · 13 exhibits

Farm runoff and sewage still carry most of the nitrogen that reaches the Chesapeake, and both are shrinking. Runoff from roofs, roads and parking lots is not. In the Bay Program’s watershed model, nitrogen delivered to the Bay from developed land rose from 27.50 million lb a year in 1985 to 40.06 million in 2025, 46% more, while the load from wastewater plants fell 72%. Since 2009, the baseline year of the Bay’s pollution limit (the TMDL), the developed-land load has risen 4.7%, and in 2025 it was 2.89 million lb above the level the jurisdictions’ own plans set for that year (Chesapeake Bay Program, 2025 modeled load indicator).

This study follows the acres and the money behind that line: what the municipal stormwater (MS4) permits in Maryland, the District and Virginia legally require, how much impervious area has been treated, what an acre and a pound of nitrogen cost, who pays, and what the September 2026 executive order on stormwater fees does and does not do. Load figures are modeled (Phase 6 watershed model, average hydrology, so they show practices and land change, not weather). Acres and pounds counted under permits are credits under state accounting rules, not monitored results. Legal requirements, set by permits, consent decrees and the TMDL, are kept apart from plans and voluntary goals.

The largest source still growing

The developed sector in the model is all urban and suburban land, regulated or not: rooftops, streets, lawns. Its load grows with the land base. It rose every year from 1985 to 2008 as the watershed built out; since 2009 it has risen a further 4.7% over sixteen years. That is what retrofits and new-development rules have bought so far: growth roughly offset, not reversed. Septic systems, the other source tied to development, rose 43% from 1985 to 2025, while agriculture fell 25%, natural land 7% and wastewater 72%.

69. Modeled nitrogen from developed land rose 46% from 1985 to 2025 and 4.7% since 2009, ending 2.89 million lb a year above the 2025 plan level

Full size

Source. Chesapeake Bay Program, CAST Phase 6 (v8.5.0) annual Progress scenarios, 1985–2025, modeled; Chesapeake Bay Program, 2025 modeled load indicator workbook (June 2026), 2009–2025 values and the 2025 Phase III WIP level.

Method. Delivered (edge-of-tide) load from regulated and unregulated developed land, average hydrology, with atmospheric deposition held at the 2025 allocation level in every year. The plan level is the sum of the jurisdictions’ Phase III Watershed Implementation Plan levels for the sector, including the climate-change adjustment.

70. Developed land (+45.7%) and septic systems (+43.2%) are the only sectors whose modeled nitrogen rose between 1985 and 2025; wastewater fell 71.9%

Full size

Source. Chesapeake Bay Program, 2025 modeled load indicator workbook, IndicatorLoads-Goals sheet, 1985 and 2025, modeled.

Method. Change: each sector’s modeled 2025 load divided by its 1985 load, less one, as a percentage; both loads from the workbook’s IndicatorLoads-Goals sheet.

The jurisdictions diverge. The District’s developed-land load fell 11.8% between 2009 and 2025 and Maryland’s 3.6%; they are the only two of seven below their 2025 plan level for the sector. Virginia’s rose 8.4% and Pennsylvania’s 7.7%, and the two account for 89% of the watershed-wide gap. Maryland’s load still rose from 8.59 to 8.96 million lb between 2024 and 2025; EPA’s 2026 evaluation says the state met its commitments for the sector while its loads continue to grow (EPA, 2026 evaluation of Maryland).

71. Since 2009 modeled developed-land nitrogen fell 11.8% in DC and 3.6% in Maryland but rose 8.4% in Virginia and 7.7% in Pennsylvania

Full size

Source. Chesapeake Bay Program, 2025 modeled load indicator workbook, jurisdiction and sector rows, 2009–2025, modeled.

Method. Each jurisdiction’s share of the Bay watershed only. Plan level: Phase III WIP 2025 level for the developed sector with the climate-change adjustment.

What the permits require

Maryland’s ten largest counties and cities, the Phase I MS4s, carry the region’s most specific legal requirement: treat a set share of the untreated impervious acres in their baseline during each permit term. The 2014 permits required 20%, 34,768 acres in all; MDE now records 35,922 as done. The permits issued in November 2021 and December 2022 require 19,106 more, due as the permits end in November 2026 (Anne Arundel, Baltimore City, Baltimore County, Montgomery) or December 2027 (the other six). A restored acre is an impervious acre credited as treated under MDE’s rules, whether by a new practice, a pond retrofit or a credit such as stream restoration.

Through FY2024 the ten had 10,860 acres credited toward the new requirement, 57%, at a reported cost of $318.7 million. Howard was at 97%; Harford was at zero, its 770 restored acres going to replace nutrient credits it bought to close out the previous permit (MDE, October 2025). The counties’ plans project 21,166 acres, 111% of the requirement, by the end of the terms at $956.8 million; only Baltimore City projects a shortfall, at 83% (MDE, October 2025).

72. Maryland’s ten largest MS4s had restored 10,860 of 19,106 required impervious acres (57%) by FY2024; they project 111% by permit end, with only Baltimore City short

Full size

Source. Maryland Department of the Environment, Financial Assurance and the Watershed Protection and Restoration Program, 2024 report (October 2025), Tables 3 and 8; county-reported credits compiled by MDE.

Method. Requirement and restoration under the permits issued in 2021–22. Harford’s 770 acres restored since its previous permit are credited to replacing 1,215 acres of nutrient credits and are not shown. Projections are the counties’ own, from their FY2024 financial assurance plans. Left out of the drawing and kept in the table: the ten-MS4 total row.

Later filings move the Maryland numbers. Anne Arundel’s FY2025 report counts 2,697 equivalent acres, 90% of 2,998, including 624 acres credited for septic pumping. Montgomery reached 1,302, 72% of 1,814, missing its year-four benchmark of 75%; it plans 555 acres in FY2026 against a best prior year of 112. Prince George’s counts 1,725 acres in its FY2025 report against MDE’s 427 at FY2024 (Anne Arundel, Montgomery and Prince George’s FY2025 MS4 reports).

The District’s permit, issued by EPA in November 2023, requires 1,175 acres managed by December 2028, with minimums in each river basin. DOEE reported 326.71 acres in the first two reporting years, 28%, with 40% of the term elapsed, and completed no stream restoration in the 2025 reporting year (DOEE, 2025 MS4 annual report; permit DC0000221). Virginia writes its permits in pounds: Phase II permittees owed 40% of their Bay TMDL reduction by June 2023 and owe 100% by October 2028 (9VAC25-890-40). Prince William County reports 9,848.18 lb a year of nitrogen reduction, 123% of its 40% requirement but 49% of the full 20,043.40 lb (draft action plan, July 2026). Falls Church, at 43% of its nitrogen requirement, is buying the remaining 756 lb from a nutrient bank under a $2.2 million, four-year contract (Falls Church Pulse).

Full size

Source. DOEE, 2025 MS4 annual report and EPA permit DC0000221; Prince William County, draft Phase II Bay TMDL action plan (July 2026); Anne Arundel, Montgomery and Prince George’s FY2025 MS4 annual reports; MDE, October 2025, Table 3 (Baltimore City); Falls Church Pulse (January 2026).

Method. Units differ: Maryland and DC requirements are impervious acres (DC: acres managed), Virginia requirements are pounds of nitrogen a year. Shares are of the full requirement due at the end of the current term, whatever the interim milestones. Counts are each permittee’s own; Prince George’s figure is the county’s, not MDE’s.

What an acre costs

County plans give the most complete price list. For FY2025–26 the ten Maryland MS4s budget $414.2 million to install practices on 9,037 acres, $45,837 an acre, a figure that excludes debt service, maintenance and monitoring. Spread across the full cost of compliance, $787.2 million, it is $87,113 per planned acre. The county range is wide: Baltimore City plans 2,632 acres at $9,521 each, Howard 197 at $260,013. MDE’s table does not break the plans down by practice, so the spread cannot be attributed from that source; Howard’s plan buys acres beyond its requirement, which it has nearly met.

74. Counties’ FY2025–26 plans put a new restored acre at $45,837 on average, from $9,521 in Baltimore City to $260,013 in Howard; with maintenance and debt it is $87,113

Full size

Source. MDE, October 2025 report, Table 5 (planned acres and cost of new practices) and Table 6 (cost of compliance), FY2025–26, budgeted; per-acre values derived.

Method. Per-acre values divide planned cost by planned acres. The full cost of compliance also pays for maintenance, monitoring and debt service on earlier work, so dividing it by new acres overstates the marginal cost of an acre. Howard’s cost of compliance ($35.0 million) is below its planned cost of new practices ($51.2 million), so its second figure is the lower one.

Other prices sit at both ends of that range. Anne Arundel’s pay-on-completion Full Delivery cycles bought 1,727 acres for about $21.6 million, about $12,500 an acre ($21.6 million over 1,727 acres), though the county’s slide does not say whether MDE credited them, and most are shoreline and stream credits (Anne Arundel County, May 2025). Prince George’s partnership contract priced its 2,000-acre base phase at $100 million in 2015, $50,000 an acre before 30 years of maintenance (UNC Environmental Finance Center). At the top, DC Water’s green infrastructure in the combined-sewer area, built to a 1.2-inch retention standard, cost about $1.17 million per acre managed at Rock Creek Project A, 3.9 to 4.7 times the planning figures of $249,553 to $298,532 on a 2012 construction-cost basis (DC Water, Practicability Assessment, 2020; 2015 plan modification). After that finding the Rock Creek green requirement was cut from 365 acres to 92 plus a storage tank, and the Potomac green requirement gave way to a larger tunnel.

75. A planned Maryland acre averages $45,837 in new-practice cost; DC Water’s built green infrastructure cost $1.17 million per acre managed, 3.9 to 4.7 times its own plan

Full size

Source. MDE, October 2025, Tables 5 and 6; Anne Arundel County MS4 presentation (May 2025), slide 27; UNC Environmental Finance Center, Prince George’s County case study (2016); DC Water, Potomac River green infrastructure practicability assessment (August 2020), Table 2-8; DC Water, 2015 LTCP modification, TM7.

Method. Logarithmic scale. The items are not like for like: Maryland acres are permit credits of any practice type, Anne Arundel’s are county-stated treated acres paid on completion, the Prince George’s figure is a contract ceiling divided by base-phase acres with no published outturn, and DC Water’s are acres managed to a 1.2-inch retention standard in the combined-sewer area, with capital cost including design in nominal 2016–18 dollars against planning figures on a 2012 construction-cost basis. Anne Arundel’s $12,530 is $21.64 million, the sum of the nine cycles on slide 27, over 1,727 acres.

Much of the credit comes from streams. Stream restoration, credited through Chesapeake Bay Program expert-panel protocols, supplies 23% of the acres Baltimore City lists as completed and 74% of Howard’s; in Anne Arundel’s and Montgomery’s FY2025 totals it is 39% and 43%. County-reported costs for completed stream projects run from $11,276 per credited acre in Carroll to $85,494 in Baltimore City (two projects), most of them below the $45,837 planned average. The credit is contested: advocates and some researchers question whether credited acres perform as modeled, MDE declined to drop it from the 2021–22 permits, and Maryland’s Whole Watershed Act of 2024 requires at least five years of monitoring. No monitoring of credited acres was found for this study.

76. Stream restoration supplies a large share of the acres counted toward the permit in each county that reports the share, at a county-reported cost mostly below the planned average per acre

Full size

Source. County FY2024 financial assurance plans and MDE review letters (May 2025), via MDE’s financial assurance plan library; Anne Arundel and Montgomery FY2025 MS4 annual reports (Tables 14 and 2.E-2); reported credits, shares and unit costs derived.

Method. Shares divide stream restoration acres by all acres in the same list; for Baltimore County, Howard, Carroll, Charles and Baltimore City the two figures come from different documents and may differ in scope (FY2019–24 to FY2022–24). Anne Arundel and Montgomery are cumulative through FY2025. Costs divide reported project cost by credited acres for completed projects in each county’s FY2024 plan.

Measured per pound of nitrogen, the ranking reverses. Prince William’s 2026 action plan prices its three stream projects at $8,371 to $14,000 per pound of annual reduction and four of its five pond retrofits at $3,277 to $8,507. Outcome-based purchases elsewhere quote far lower prices because they buy farm practices and count pounds differently. Pennsylvania’s PENNVEST Clean Water Procurement Program has signed eight agreements worth up to $26.2 million, all on farms, wetlands and buffers and none for urban stormwater, at derived prices of about $185 to $645 per pound; one firm, HGS, LLC, holds five of the eight and 86% of the dollars (PENNVEST). The Maryland and Susquehanna River Basin Commission pay-for-success round paid roughly $6 to $136 per pound (SRBC, March 2026), and Maryland’s trading register lists averages of $45.80 to $237.50 (MDE). Annual and lifetime bases differ or are not stated, so these prices set an order of magnitude, not a benchmark.

77. In Prince William’s 2026 plan, stream restoration costs $8,371 to $14,000 per pound of annual nitrogen reduction; four of five pond retrofits cost $3,277 to $8,507

Full size

Source. Prince William County, draft Phase II Chesapeake Bay TMDL action plan (revised July 6, 2026), Appendix C, budgeted.

Method. The plan’s own cost per pound of total nitrogen removed per year. The $50,000 retrofit is Pond #62, at 7 lb a year. Appendix E gives Middle Dewey’s Phase 1 a cost of $9,957,400 against $6,244,800 in Appendix C; Appendix C is used.

Who pays, and the federal turn

Maryland’s counties pay mostly with debt and general revenue. Their FY2025–26 plans draw $437.4 million from bonds and loans, $313.6 million from general funds and other sources, $275.7 million from stormwater remediation fees, $26.9 million from state grants and $9.7 million from federal grants. Fees matter most where they are large relative to the program: they fund 93% of Baltimore City’s planned funding and 71% of Montgomery’s. Seven of the ten charged a fee in FY2024; residential fees ranged from $0.01 to $197 a year, and Baltimore County repealed its fee in 2017 (MDE). Howard raised its rates in 2024 and collected $25.6 million in FY2025, against $10.5 million in FY2024 (Howard County).

Virginia’s largest program is Fairfax County’s Stormwater Service District, a levy of $0.0325 per $100 of assessed value that raised $104.2 million in FY2025 (Fairfax County, Fund 40100), more than the $84.6 million in fees MDE recorded for its Phase I jurisdictions in FY2024 (Montgomery does not report to that table). In the District the comparable charge is DC Water’s Clean Rivers Impervious Area Charge, $24.23 per equivalent residential unit a month in FY2026, which pays for the combined-sewer tunnels rather than the MS4 program (DC Water); DOEE’s own stormwater fee revenue is not among the sources compiled here.

78. Stormwater fees are 26% of the $1.06 billion Maryland’s MS4s plan to spend in FY2025–26 and fund 93% of Baltimore City’s plan; Fairfax’s levy alone raised $104.2 million in FY2025

Full size

Source. MDE, October 2025 report, text and Table 7 (FY2025–26 funding sources, budgeted) and Table 9 (FY2024 fee revenue, reported); Fairfax County, Fund 40100 Stormwater Services fund statement (FY2026 third quarter), FY2025 actual.

Method. Table 7 prints county amounts rounded to $1 million, so the shares in the second panel are approximate. Carroll and Harford fund their programs from a property tax and a recordation tax. Table 9 shows no fee revenue for Prince George’s, though its footnote says the county received fee funds ($14.7 million in its watershed fund and $59.5 million in its stormwater enterprise fund); Montgomery is not required to report to Table 9.

On September 16, 2026 the President signed Executive Order 14428. It revokes the 2009 Chesapeake order (EO 13508) and directs EPA to coordinate with the six Bay states and the District to assess the burden of stormwater fees and to “take measures to encourage the repeal or rescission of stormwater management fees imposed by States or localities and funded by their respective residents” (EO 14428, 91 FR 59975). The order repeals no fee itself, sets no deadline, is subject to appropriations, creates no enforceable rights and does not mention the TMDL; the permits’ acre and pound requirements are unchanged (WJLA). No EPA notice, guidance or grant condition implementing it had been found as of October 12, 2026.

The exposure is arithmetic. A county that dropped its fee would keep its permit obligation, and the cost would move to general funds or borrowing. Baltimore City and Montgomery, where fees are 93% and 71% of planned funding, have the largest shares to replace; the five jurisdictions where fees fund less than 7% of planned FY2025–26 funding (Exhibit 78) would see little or no change.

Partnerships and markets

Prince George’s tried to buy acres wholesale. It ended its 2014 permit term with 2,387 of 6,105 required acres, a deficit of 3,718, and in December 2021 entered a consent decree with MDE that set a December 2024 deadline and a $475,000 penalty (consent decree). Its Clean Water Partnership with Corvias, a 30-year design-build-operate-maintain agreement, priced a 2,000-acre base phase at $100 million with an option for 2,000 more (UNC case study). The partner reports nearly 5,000 acres treated across 428 projects, in a July 2026 release (release). MDE’s October 2025 report records the prior-permit requirement as met, on the county’s December 2024 documentation, and credits 427 acres toward the current permit at FY2024; the county’s FY2025 report claims 1,725.

79. The Prince George’s partnership’s acre count, the county’s and the state’s cannot be reconciled from the published documents

Full size

Source. MDE, October 2025 report, Tables 2 and 3 and text; UNC Environmental Finance Center case study (contract terms); partner release, July 14, 2026 (treated acres); Prince George’s County FY2025 MS4 report.

Method. Partner-reported acres are “treated”, without a definition, and cover partnership projects only; MDE’s figures are permit credits for all county work. The 5,000 is the release’s “nearly 5,000”.

Trading was meant to let permittees buy cheaper reductions. Maryland’s register records 107,443 lb of nitrogen credits traded from March 2019 to July 2026, almost all from county wastewater plants to three county accounts (Anne Arundel, Harford and Frederick); of 1,957,276 lb certified, 2,621 lb came from stormwater or other alternative sources. Volume fell from 34,440 lb in 2020 to 334 in 2025 (MDE register). In the District, the retention credit market created in 2014 averaged $2.07 a credit in FY2017 (DOEE, FY2017 report) and $1.63 in FY2021, the last year DOEE published prices (FY2020–21 report); unused credits more than a year old rose from 1,049 in the 2023 annual report to 594,603 in 2025, so supply of off-site retention outruns demand at current rules.

80. Maryland’s nitrogen credit trades fell from 34,440 lb in 2020 to a few hundred a year since 2023, while unused DC retention credits rose to 594,603

Full size

Source. MDE, Water Quality Trading register (All_Trades sheet, to July 10, 2026); DOEE 2025, 2024 and 2023 MS4 annual reports.

Method. Maryland: registered trades of nitrogen credits by year of registration, all sellers and buyers. DC: the annual report’s count of credits more than one year old that are going unused; the 2023 report words it as unsold.

Where the work is bought, payments are spread across many vendors. Montgomery County’s spending data record $338.7 million in payments under its Watershed Restoration program from FY2014 to FY2026. The largest payee is an agency, the Maryland-National Capital Park and Planning Commission ($44.3 million); USGS received $6.4 million and the largest private payee, Environmental Quality Resources, $33.2 million. These are payments, not contract values, and the program includes stormwater facility maintenance as well as restoration. FY2026, the last full fiscal year before the county’s permit term ends, was the largest at $44.9 million (Montgomery County spending data).

81. Montgomery County recorded $338.7 million in Watershed Restoration program payments in FY2014–FY2026, $44.9 million of it in FY2026

Full size

Source. Montgomery County, Maryland, open data, County Spending dataset, Department of Environmental Protection, Watershed Restoration program, FY2014–FY2026, reported payments.

Method. Payments with a positive amount summed by fiscal year. They include transfers to public agencies (M-NCPPC, USGS) and a payee label for facility repair, and are not contract values. Left out of the drawing and kept in the table: the FY2014–FY2026 total row.

What would close the gap

The record points to four levers. The first is the base: the developed-land load grows with the land, so standards for new development and redevelopment decide how much of each year’s retrofit spending simply offsets growth. The second is the unit of purchase. Acres are a poor proxy for pounds: in Prince William’s plan a pond retrofit removes nitrogen at about half the cost per pound of a stream project, and pay-on-completion contracts such as Anne Arundel’s Full Delivery and Pennsylvania’s procurement program show that paying for verified results is workable. The third is verification. Credited acres are modeled; the Whole Watershed Act’s five-year monitoring rule and a public reconciliation of partner-reported and permit-credited acres in Prince George’s would show what the $318.7 million spent through FY2024 bought. The fourth is stable money. Fees are a quarter of Maryland’s planned FY2025–26 funding; cutting them without changing the permits would shift the cost to borrowing and general funds, not remove it.

Limitations (9)

  • Method. Monitored performance of credited acres. Every Maryland, Virginia and Pennsylvania acre and pound figure here is a modeled credit under state rules; no monitoring of credited stream restoration or other practices was found.
  • Conflicting sources. Prince George’s acres. MDE’s 2024 report showed 2,387 of 6,105 prior-permit acres and its 2025 report shows 6,105 on the county’s December 2024 documentation; no MDE letter accepting completion was found. The current-permit count is 427 (MDE, FY2024) or 1,724.81 (county, FY2025). The partner’s “nearly 5,000” treated acres, its subcontract totals ($175M, $179M, over $270M) and its projected 30% cost reduction rest on partner releases.
  • Method. Anne Arundel Full Delivery acres. The 1,727 acres and $21.6M are rounded slide values; whether MDE credited the acres and whether awards include maintenance is not stated.
  • Coverage. DC retention credit prices after August 2022 and DOEE stormwater fee revenue. DOEE’s last published program report covers FY2020–21; neither was found.
  • Coverage. Virginia statewide progress and credit prices. No permit-level roll-up of Phase II MS4 pounds and no nutrient credit price or volume data were retrievable; Fairfax County’s quantified Bay goal and results were not opened.
  • Coverage. Pennsylvania urban stormwater. No pollutant reduction plan progress was found for Lancaster, York or Harrisburg, and the 2018 PAG-13 general permit has not been reissued.
  • Unverified. EO 14428 implementation. No EPA notice, guidance, grant condition or state response implementing Section 3(b) was found as of October 12, 2026, and reactions from localities were not collected.
  • Conflicting sources. Baltimore City’s FY2023 to FY2024 count. MDE’s 2024 report shows 1,488 acres at FY2023 and its 2025 report 1,453 at FY2024; no explanation was found.
  • Method. Per-pound prices across programs. Annual and cumulative bases differ or are not stated in the PENNVEST, SRBC and Clean Water Commerce Act sources, so no like-for-like price per pound could be built.

Sources (19)

  1. Chesapeake Bay Program: Modeled Load Reduction Indicator, 2025 data workbook (June 24, 2026); CAST Phase 6 (v8.5.0) public reports, annual Progress scenarios 1985–2025
  2. EPA: 2026 evaluation of Maryland’s 2024–2025 milestones (August 2026); Region 3, NPDES permit DC0000221, District of Columbia MS4 (November 2023)
  3. Maryland Department of the Environment: Financial Assurance and the Watershed Protection and Restoration Program, 2024 report (MSAR 10954, October 2025); Financial assurance plans and review letters (FY2024); Maryland Department of the Environment v. Prince George’s County, consent decree (2021); Water Quality Trading register (xlsx); Water Quality Trading registry market page
  4. Anne Arundel County: FY2025 NPDES MS4 annual report (December 2025); MS4 program presentation (May 2025)
  5. Montgomery County, Maryland: Department of Environmental Protection, FY2025 MS4 annual report; Open data, County Spending dataset
  6. Prince George’s County: FY2025 NPDES MS4 Phase I annual report
  7. Howard County: Watershed Protection and Restoration Fund report, FY2025 (March 2026)
  8. DC Department of Energy and Environment: 2025 MS4 annual report (December 2025); 2024 MS4 annual report; 2023 MS4 annual report; Stormwater Retention Credit program report FY2017; Stormwater Retention Credit program report FY2020–FY2021
  9. DC Water: Impervious Area Charge; Potomac River and Rock Creek green infrastructure practicability assessment (August 2020); Green infrastructure long-term control plan modification (May 2015)
  10. Virginia Administrative Code: 9VAC25-890-40, MS4 general permit
  11. Prince William County: Draft Phase II Chesapeake Bay TMDL action plan (revised July 6, 2026)
  12. Falls Church Pulse: Nutrient credits to cost $2 million (January 2026)
  13. Fairfax County: Fund 40100 Stormwater Services, FY2026 third-quarter fund statement
  14. UNC Environmental Finance Center: Prince George’s County Clean Water Partnership case study (2016)
  15. Business Wire: Clean Water Partnership participant (CIS) release on a Harvard Extension School capstone (July 14, 2026)
  16. Federal Register: Executive Order 14428, Providing Meaningful Water Quality Improvements Through Collaboration and Oversight of Federal Support, 91 FR 59975 (September 21, 2026)
  17. WJLA: Report on EO 14428 and Maryland stormwater fees (September 24, 2026)
  18. PENNVEST: Clean Water Procurement Program
  19. Maryland and Susquehanna River Basin Commission: Pay-for-performance presentation (March 9, 2026)

Read next

  • Nitrogen From Farms Pennsylvania’s farms delivered 63.72 million lb of modeled nitrogen in 2025, 23.87 million above their plan level and 67% of agriculture’s gap
  • The Chesapeake and the Region’s Waters In the 2025 model run the watershed had made 57% of the required nitrogen reduction, 90% of the phosphorus and 100% of the sediment

Updated November 14, 2026 · Data as of October 18, 2026.

Data for every exhibit: download (CSV)

Corrections

  • Part 6: Exhibit 76’s title now covers the counties that report a stream-restoration share; Baltimore City and Montgomery have the largest fee shares, not the most dollars, to replace.

A principal of Higgins Strategy is employed by a contractor in the regional stormwater market. No figure in this study was obtained through that employment, and no company was added to or removed from the data on that account.

The Chesapeake and the Region’s Waters, part 6 of 10.

Next: Study XXI, Nitrogen From Farms