The Capital Region

The Chesapeake and the Region’s Waters

The Bay cleanup and the rivers, harbors and coastal bays around it; by the 2025 deadline the Bay watershed had made 57% of its required nitrogen cut.

103 min read · 129 exhibits

The Chesapeake Bay cleanup reached its 2025 deadline with one of three pollutants on target. Everything on the scorecard is modeled. The loads are estimates from the Phase 6 watershed model, run each year with the practices the jurisdictions report, against fixed average weather. The rivers and the Bay itself are measured separately, and this study keeps the two apart.

The largest environmental works in the Capital Region over the past two decades are not wetlands or oyster reefs. They are sewer tunnels and treatment-plant upgrades: three tunnels under the District, nitrogen-removal plants at Blue Plains, Back River and Patapsco, Alexandria’s RiverRenew, and Hampton Roads’ plan to inject treated water into the Potomac aquifer. Most were built under consent decrees or state law, and ratepayers carry most of the cost.

The Chesapeake cleanup is scored mostly in pounds of nitrogen, phosphorus and sediment. The Bay’s plants and animals keep a separate score, and after four decades it is mixed.

Part 1 · The Bay Scorecard. How the Chesapeake cleanup is graded against its Total Maximum Daily Load, the legal pollution limit; in 2025 it had made 57% of the nitrogen cut required. Exhibits 1–12.

Part 2 · Pipes and Tunnels. The sewers and treatment plants built around the Bay; the District’s combined sewer overflow fell from 5,828 million gallons in 2005 to 253 million in 2025. Exhibits 13–26.

Part 3 · Who Does the Work. Who gets paid to clean up the Bay: the builders, engineers, owners and grant intermediaries, and how concentrated the money is. Exhibits 27–40.

Part 4 · Grasses, Crabs, Oysters and Fish. The Bay’s wildlife and water clarity four decades into the cleanup; Maryland’s bald eagle breeding pairs rose from 44 in 1977 to more than 1,400 in 2025. Exhibits 41–54.

Part 5 · The Region’s Other Waters. Rivers and coastal bays beyond the Chesapeake; on the Delaware at Philadelphia, summer days below the oxygen criterion fell from 85 in 1965 to none in 2025. Exhibits 55–68.

Part 6 · Every Impervious Acre. Runoff from roofs, roads and parking lots under stormwater permits; developed land’s nitrogen rose from 27.5 million lb a year in 1985 to 40.1 million in 2025. Exhibits 69–81.

Part 7 · Nitrogen From Farms. Agriculture’s part in the Bay’s pollution limit; in 2025 Pennsylvania’s agriculture delivered 23.87 million lb a year more than its plan level. Exhibits 82–94.

Part 8 · Rivers and Harbors. Report cards for the James, Potomac, Elizabeth and Baltimore’s waterfront; at Fells Point 83% of 2024 samples met the swimming standard, against none in 2011. Exhibits 95–108.

Part 9 · Conowingo Dam and the Dredging Islands. Conowingo Dam no longer traps the Susquehanna’s sediment, and Bay channel spoil needs new islands: what each fix has bought so far, and at what cost. Exhibits 109–122.

Part 10 · The Cleanup Shortfall and Coming Deadlines. What the Bay’s pollution limit still requires after 2025; Pennsylvania holds 87% of the nitrogen gap but none of the dated legal requirements ahead. Exhibits 123–129.

Limitations (1)

  • Unverified. Each part lists what it could not verify.

Sources (5)

  1. EPA: 2025 Assessment of the Chesapeake Bay Program Partnership’s Progress toward the 2025 Water Quality Goal. August 13, 2026
  2. Chesapeake Bay Program: 2025 Modeled Load Reduction Indicator, data workbook (June 24, 2026); Bay Barometer 2024–2025. March 4, 2026
  3. Chesapeake Executive Council: Chesapeake Bay Watershed Agreement, as amended December 2, 2025
  4. DC Water: Long Term Control Plan consent-decree quarterly report, Q2 2026. July 27, 2026
  5. Virginia Institute of Marine Science and Chesapeake Bay Program: Submerged aquatic vegetation abundance, 2025 data workbook (preliminary, August 12, 2026)

Read next

  • The Bay Scorecard In the 2025 model run the watershed had made 57% of the required nitrogen reduction, 90% of the phosphorus and 100% of the sediment
  • Pipes and Tunnels The Anacostia tunnels opened in March 2018 and the Northeast Boundary Tunnel in September 2023; the Potomac River Tunnel is due February 8, 2030
  • Who Does the Work

Updated November 12, 2026 · Data as of October 17, 2026.

Next: Study XXI, The Bay Scorecard