The Capital Region
Rivers and Harbors
Report cards for the James, Potomac, Elizabeth and Baltimore’s waterfront; at Fells Point 83% of 2024 samples met the swimming standard, against none in 2011.
10 min read · 14 exhibits
Most people in the region meet the Chesapeake through a handful of tidal rivers: the Anacostia and the Potomac at Washington, Baltimore’s Inner Harbor and the Patapsco, and the Elizabeth and the James in Hampton Roads. These are the waters where residents now ask to swim and fish, and where the oldest industrial contamination sits. This study compares them across the District, Maryland and Virginia on what is monitored or graded: index scores, bacteria, trash, toxic sediment, and the dates set for each.
The broad result is mixed. On the one regional yardstick that scores all of them the same way, the James, the Elizabeth and the Patapsco are better than they were in the late 1980s and the Potomac is not. Every local report card sits between C- and B, and none of the swimmable dates set for these rivers has yet been met. Sewer tunnels and treatment plants are covered in Pipes and Tunnels; the Potomac and Patuxent fall-line loads and the region’s small streams are in The Region’s Other Waters.
One yardstick across three jurisdictions
The University of Maryland Center for Environmental Science (UMCES) scores each Bay region every year from the same monitoring network, on a 0 to 100 index in which 40 separates poor from moderate. Four of its regions match the rivers here: the Potomac, which runs past Washington and drains parts of all three jurisdictions; the Patapsco and Back Rivers, which hold Baltimore’s harbor; and the James and the Elizabeth in Virginia.
Annual scores swing with rainfall, so decade averages are the cleaner comparison. Between 1986–95 and 2015–24 the James gained 16 points and the Elizabeth 12; the Patapsco and Back nearly doubled from a very low base; the Potomac did not move. In 2024 the Potomac scored 38 and the Patapsco and Back 27, both poor, while the James scored 55 and the Elizabeth 45.
95. Decade averages on UMCES’s monitored Bay Health Index rose from 39 to 55 on the James, 24 to 37 on the Elizabeth and 13 to 24 on the Patapsco and Back, but held at about 40 on the Potomac
Source. University of Maryland Center for Environmental Science, Chesapeake Bay Report Card, Bay Health Index data file, 1986–2024; monitored
Method. Green bars are averages of the annual scores for 1986–95 (9 years; no 1988 value is published except for the Elizabeth) and 2015–24. The thin rule marks 40, the line between poor and moderate. Regions are UMCES reporting regions; the Potomac region covers the tidal river shared by the District, Maryland and Virginia.
The index is an average of indicators, and they show where the remaining problem lies. Dissolved oxygen scored 72 or better in all four regions in 2024. Water clarity scored low in all four regions, 0 to 22. Algae, measured as chlorophyll a, scored 23 in the Potomac and 0 in the Patapsco and Back but 41 in the Elizabeth and 58 in the James. In the Patapsco and Back the nitrogen, phosphorus, chlorophyll and clarity scores were 0 to 2 even as bottom life scored 67. Oxygen is what sewage treatment fixes first; clarity and algae respond to nutrient and sediment loads from the whole watershed.
96. In 2024, dissolved oxygen scored 72 to 98 in all four regions, but water clarity scored 0 to 22, and the Patapsco and Back scored 0 to 2 on nitrogen, phosphorus, chlorophyll and clarity
Source. UMCES, Chesapeake Bay Report Card, Bay Health Index data file, 2024 indicator scores; monitored
Method. Scores are 0 to 100, the share of each indicator’s threshold met. UMCES does not score underwater grasses or bottom life for the Elizabeth region. The Patapsco and Back column is in green.
The local report cards
Each river also has a card from a local group, built on its own method and scale, so scores do not compare across rivers; the letter grade is the common denominator. The Potomac Conservancy grades the whole Potomac; the Anacostia Watershed Society (AWS) grades the tidal Anacostia in the District and Maryland; Waterfront Partnership of Baltimore grades the harbor; the James River Association and the Elizabeth River Project grade the two Virginia rivers. All five publishers are advocates as well as scorers.
The grades have risen. The Potomac went from D in 2011 to B in 2025, its fifth B-level grade in a row. AWS gave the Anacostia 52% (F) in its 2023 report and 71% (C-) in its 2026 report, the river’s highest since grading began in 2014. The James moved from 53% (C) in 2013 to 68% (B) in 2025. None is above B, and three of the five are in the C range.
97. Every local report card on the rivers of the three jurisdictions now grades its water between C- and B; none has reached an A
Source. Potomac Conservancy, report archive and 2025 press page; Anacostia Watershed Society, State of the River report card (2026), DCist (2023) and The Wash (2018); Waterfront Partnership, Healthy Harbor ecosystem health data, 2010–2024; James River Association, State of the James 2025, 2023 and 2013; Elizabeth River Project, State of the River 2023
Method. Gray dots are earlier grades, green the latest; years are report or data years as each publisher labels them. Each publisher uses its own indicators and scale, so positions compare grades, not underlying scores. The Anacostia’s 2018 grade is as reported by The Wash; AWS’s scale may have changed since. Baltimore Harbor shows selected years from a continuous series.
Baltimore’s harbor card has the longest numeric record of the five. Its ecosystem score rose from 30 in 2010 to 52 in 2013 and has since stayed within a 13-point band, with dips in 2020 and 2021 that the card attributes to failures at the Patapsco treatment plant. 2024, the driest year since monitoring began, scored 50: dissolved oxygen earned its first A (87) while chlorophyll scored 30, a D.
98. Baltimore Harbor’s ecosystem score has stayed between 40 and 53 every year since 2012 and was 50, a C, in 2024
Source. Waterfront Partnership of Baltimore, Healthy Harbor report card data, ecosystem health 2010–2024; monitored (data collected by Blue Water Baltimore)
Method. The score averages dissolved oxygen, chlorophyll a, water clarity, nitrogen and phosphorus scores on the UMCES protocol for the Inner Harbor, Middle Branch and the Patapsco out to Fort McHenry; 2011 had too little data for an overall score. Scores are drawn as published to one or two decimals.
The James card combines river health with restoration effort, and the two halves have moved apart. River health scored 64% in 2021 and 62% in 2025, while restoration efforts rose from 58% to 74%. The weakest indicators are in the tidal river, where the association says underwater grasses, oysters and tidal water quality declined over the last two years.
99. The James scored 68% overall in 2025, but American shad scored 0%, underwater grasses 41% and oysters 58%, against 94% for wastewater controls
Source. James River Association, State of the James 2025, indicator narratives and report card; reported (monitored indicators and program measures)
Method. Each indicator is the percentage of a benchmark the association sets; the overall index averages them. Pollution indicators measure progress toward Virginia’s Bay-plan reductions, and the bacteria indicator is the share of 2019–24 assessments meeting state standards.
Branches and smaller rivers
The Elizabeth River Project grades each branch by converting parameter grades to grade points and averaging them; 3.0 is a B. In the 2023 scorecard (data for 2018–22) the Main Stem (3.28) and Lafayette (3.10) graded B and Broad Creek (1.50) graded D; the river-wide, area-weighted score rose from 2.7 in 2020 to 2.9. Recreational bacteria graded A in all five main branches but D in Broad Creek and Indian River, and the project states that its bacteria data make no determination of safe or unsafe swimming.
On Maryland’s Eastern Shore, ShoreRivers publishes a water-quality index for each river on the UMCES protocol. In 2025 the lower Choptank set a record at 71% and Harris Creek reached 83%, while the Chester fell to 52% from 58% and the upper Choptank scored 53%. ShoreRivers also reports that 47% of samples in its August 2026 bacteria blitz met Maryland’s swimming standard, a one-week snapshot rather than a season average (ShoreRivers, 2026).
100. On the Elizabeth, the Main Stem and Lafayette graded B in the 2023 scorecard and Broad Creek graded D; the river-wide score rose from 2.7 to 2.9, short of the 3.0 for a B
Source. Elizabeth River Project, State of the River 2023 (data 2018–2022), Tables 3 and 5; monitored
Method. Each parameter grade is converted to its midpoint (A 4.5, B 3.5, C 2.5, D 1.5, F 0.5) and averaged; branches and tributaries are unweighted, and the river-wide score weights the five main branches by area. The report’s Table 5 gives the Eastern Branch 2.17 and Southern Branch 2.50 against 2.50 and 2.61 in Table 3; Table 3 is drawn.
101. On the Eastern Shore, the lower Choptank set a record 71% in 2025 while the Chester fell to 52% from 58% the year before
Source. ShoreRivers, Choptank River report card 2025 and Chester River report card 2025; earlier cards in the same series; monitored
Method. The index averages dissolved oxygen, nitrogen, phosphorus, clarity and chlorophyll scores on the UMCES protocol. 2025 values were re-read from the 2025 cards; 2022–24 values come from earlier cards, and the 2024 Choptank values were read from an image of the card.
Swimmable when it has not rained
Bacteria decide whether a river is swimmable, and in these rivers bacteria follow rain. Waterfront Partnership tests five harbor sites against Maryland’s recreational standard, a pass or fail threshold of 104 MPN. At Fells Point the share of samples that passed rose from none in 2011 to 83% in 2024; Waterfront Partnership says most failures came during or just after rain and that Inner Harbor sites tend to pass when it has not rained for 48 hours. On the Anacostia, AWS’s fecal bacteria score fell from 67% to 58% in its 2026 report, a measure it calls heavily weather dependent. On the James, 66% of bacteria assessments in 2019–24 met state standards.
102. At Fells Point, 83% of 2024 harbor samples met Maryland’s swimming standard, against none in 2011; the Mr. Trash Wheel site at the mouth of the Jones Falls passed 60% of the time
Source. Waterfront Partnership of Baltimore, Healthy Harbor report card data, recreational health 2011–2024 and 2025 water quality update; monitored (Blue Water Baltimore 2011–22, Waterfront Partnership 2022–24)
Method. Share of samples meeting the Maryland standard (104 MPN pass or fail) over the sampling season, scored on the UMCES protocol. Results swing with rain: 2018, the wettest year on record, was high at most sites and 2015 low at all. The thin rule marks 50%.
Rain is not the only source. On January 19, 2026, a section of the Potomac Interceptor, a 72-inch sewer that carries up to 60 million gallons a day to Blue Plains, collapsed along the Clara Barton Parkway in Montgomery County. DC Water and the Justice Department put the release at more than 200 million gallons. Maryland’s attorney general, suing the same day the federal complaint was filed (April 20, 2026), gives an estimated 240 million gallons over eight days. The last overflow reached the river on February 8 and emergency repairs were finished March 14. The federal complaint seeks penalties and rehabilitation; Maryland’s suit alleges DC Water knew the over half-century-old line showed corrosion. DC Water describes a 10-year, $625 million rehabilitation program.
103. The Potomac Interceptor collapse released more than 200 million gallons by DC Water’s count and 240 million by Maryland’s, about as much as the District’s modeled sewer overflow to the Potomac in all of 2025
Source. DC Water, Potomac Interceptor collapse page; U.S. Department of Justice, press release (April 20, 2026); Maryland Attorney General, press release (April 20, 2026); DC Water, combined sewer overflow quarterly reports, 2025 (sum of four quarters, modeled)
Method. Millions of gallons. The two spill figures use different definitions: DC Water and the Justice Department give a floor for the whole release, which DC Water says last reached the river on February 8; Maryland gives an estimate over eight days. The 2025 overflow figure is a model result for the District’s Potomac outfalls in an actual-rainfall year.
Trash
Trash is the most visible problem and the one with the best count. Baltimore’s four trash wheels weigh every dumpster they fill; summed, they collected 3,934.5 tons from May 2014 to June 26, 2026. Annual tonnage nearly doubled between 2020 and 2022 after Gwynnda went into service on the Gwynns Falls, peaked at 504.5 tons in 2023, and was 383.9 tons in 2025. Collection depends on rainfall and siting; it measures trash intercepted, not trash prevented. For scale, the District estimates that about 1.2 million pounds of trash, some 600 tons, enter the Anacostia each year.
104. Baltimore’s four trash wheels collected 3,934.5 tons through June 26, 2026, and Gwynnda, in service since 2021, supplied more than half of each year’s total in 2022–24
Source. Waterfront Partnership of Baltimore, Mr. Trash Wheel family collection data (published sheet), May 2014 to June 26, 2026; reported weights summed by calendar year
Method. Short tons, the sum of dumpster weights recorded on each wheel’s sheet. *2026 runs to June 26. Mr. Trash Wheel is at the mouth of the Jones Falls, Professor on Harris Creek, Captain at Masonville Cove and Gwynnda on the Gwynns Falls.
Cumulative claims need a definition. Waterfront Partnership’s FY2023 annual report says the wheels had collected 2,362 tons to date; summing its own published sheet by July–June year through FY2023 gives 2,577.9 tons. Single fiscal years match closely (FY2023: 387.5 tons on the sheet, 384 in the report), so the gap is in the running total, not the weighing.
105. Waterfront Partnership’s FY2023 report puts cumulative trash-wheel collection at 2,362 tons, 216 tons below the 2,578 summed from its own published sheet, while single fiscal years agree within 1.5%
Source. Waterfront Partnership, trash wheel collection data (published sheet) summed by July–June year; Waterfront Partnership of Baltimore, Annual Report FY2023; reported
Method. The report’s 480 tons appears under the heading for FY2023 but describes the year before its 384-ton FY2023 total; it is matched here to FY2022, the sheet year it fits. The report does not define its cumulative period.
Toxic hot spots
Contaminated sediment is the slowest problem to fix and the one most tied to eating fish. On the Elizabeth’s Southern Branch, the Elizabeth River Project has dredged, capped and replanted the Money Point shoreline in phases: Phase 1 cost $1.3 million and Phase 2 $3.3 million (another slide in the same deck gives $3.4 million). Average PAH concentration across the three Phase 2 restoration sand areas fell from 652 mg/kg in 2011 to 15.3 in 2016, against a 45 mg/kg project goal. Phase 3, the northern dredging and capping, is priced at $15 million; the project’s web page describes it as not yet started pending funding, while the project team’s slides describe the funding as identified.
106. At Money Point on the Elizabeth, average sediment PAH across the Phase 2 restoration areas fell from 652 mg/kg in 2011 to 15.3 in 2016, under the 45 mg/kg goal
Source. Elizabeth River Project, Money Point slide deck, Engineering With Nature knowledge series (November 20, 2025), slide 31; monitored (project team results)
Method. Total PAH in surface sediment of the Phase 2 restoration sand areas, averaged by sampling event. The deck labels the 2011 values post-dredge residuals; the average is the deck’s numeric average of the three areas. 2012–15 values are in the CSV.
In the District, DOEE’s Interim Record of Decision (September 30, 2020) selected early cleanup of 11 PCB hot spots, about 77 acres in all, for an estimated $35.5 million, which DOEE says would cut human-health risk from PCBs by about 90%. A June 2023 schedule put construction from fall 2025 to fall or winter 2026 (District Q&A, 2023); the construction solicitation set proposals due November 30, 2025 (solicitation listing), and we found no award. Separately, Pepco’s Benning Road site has been under a consent decree since 2011, with proposed cleanup plans issued in 2024 and 2025 (DOEE).
107. The District’s interim Anacostia sediment cleanup covers about 77 acres in 11 PCB hot spots at an estimated $35.5 million, which DOEE says would cut human-health risk from PCBs by about 90%
Source. District Department of Energy and Environment, Anacostia River Sediment Project fact sheet (October 2020) and Interim Record of Decision announcement (September 30, 2020); estimated
Method. The main stem and Kingman Lake areas are to be dredged and capped and the Washington Channel areas capped. Costs are the decision’s estimates, not contract values. The decision is interim; a final river-wide decision is to follow monitoring.
What is planned
The dates ahead are of two kinds. Legal requirements set by permit, decree or Superfund decision include Prince George’s County’s stormwater permit, which requires 2,137 impervious acres restored by December 1, 2027 (the county reported 427.48 acres, 20%, by fiscal 2024; county financial assurance plan), and the District’s sewer decree: the Potomac River Tunnel is required by the consent decree to be placed in operation by February 8, 2030 (DC Water consent decree quarterly report, Q2 2026). Voluntary goals include the Anacostia swimmable target, Waterfront Partnership’s 2030 vision, which replaced the missed 2020 swimmable and fishable goal, and the Baltimore Oyster Partnership’s 5 million oysters by 2030. Virginia’s 2020 farm law sits between the two: practices are voluntary until 2028 and some, such as fencing cattle out of streams, become mandatory if the goal is missed.
Three changes would make the next dates more credible. The first is sewage: the Potomac tunnel and the Potomac Interceptor rehabilitation are what stand between the Potomac at Washington and the bacteria results the Anacostia tunnels have produced. The second is a measurable definition of swimmable, such as the share of samples meeting the state standard over a season at named sites, set before a date is announced; Baltimore’s harbor card already reports that number. The third is contracts: the Anacostia hot spots and Money Point Phase 3 have selected remedies and cost estimates but no confirmed start.
Federal policy shifted in September. Executive Order 14428 (September 16, 2026) revoked the 2009 Chesapeake order and encourages repeal of state and local stormwater fees; it sets no numeric deadlines. EPA’s 2025 Assessment says the partnership has committed to new Bay targets and new or revised state plans by 2030, setting the reductions needed by 2040.
108. The dated commitments ahead mix legal deadlines with voluntary goals, and every swimmable date set for these rivers is voluntary
Source. Waterfront Partnership, 2020 Harbor Heartbeat; DCist (2023); The Wash (2018); District Q&A on the sediment project (June 2023); Prince George’s County FY2024 financial assurance plan; James River Association (2025); DC Water consent decree quarterly report, Q2 2026; Baltimore Oyster Partnership; EPA 2025 Assessment
Method. Legal requirements rest on a permit, consent decree, Superfund decision or the Bay TMDL framework; the sediment cleanup date is a schedule under an interim decision, not a court deadline, and no construction award was found. The District’s 2027 swimmable date is as stated by a speaker quoted by The Wash in 2018; AWS’s 2025 date is as quoted by DCist.
Limitations (10)
- Unverified. The Anacostia Watershed Society’s 2023–2026 report PDFs could not be opened (HTTP 403), so the 2026 score, grade and bacteria figures come from its report-card page and the 2023 score from DCist; the 2024 and 2025 scores were not found, and AWS’s scale may differ between the 2018 report (63, D) and later ones.
- Unverified. The District’s 2027 swimmable date for the Anacostia rests on one speaker quoted by The Wash in 2018, and the 2025 date on an AWS staff member quoted by DCist in 2023; no adopted District document with either date was opened. Whether any swimming areas have been designated in 2026 was not found.
- Coverage. Waterfront Partnership’s published sheet gives Baltimore Harbor scores to one or two decimals; its web page shows a chart without numerals. The 2020 Harbor Heartbeat sets the 2020 goal and a 2030 vision of new projects; it does not itself re-date the swimmable goal. No card for data year 2025 was found.
- Unverified. No construction award for the Anacostia sediment early actions was found as of mid-October 2026, so whether the 2026 completion in the 2023 schedule still holds is unknown. Records of decision for Pepco’s Benning Road site were not found.
- Conflicting sources. Money Point Phase 2 cost appears as both $3.3 million and $3.4 million in the same deck, and Phase 3 ($15 million) is described as both funded and not yet started. PAH results after 2016 were not found; all results are from the project team.
- Conflicting sources. The Potomac Interceptor spill volume differs by definition (more than 200 million gallons for the whole release; an estimated 240 million over eight days). A $20 million repair estimate appears only in a secondary summary and is not used. Contractors for the interceptor work were not named in the sources opened.
- Method. Trash-wheel tons measure what the wheels intercept, which varies with rainfall; they are not a measure of trash load avoided. The DOEE estimate of trash entering the Anacostia is an annual estimate without a stated method on the card.
- Conflicting sources. The Elizabeth River report’s Tables 3 and 5 disagree for two branches. ShoreRivers 2022–24 values were not re-read from the original cards for this page, and the 2024 Choptank values were read from an image. The Potomac Conservancy calls its 2025 grade the fifth B-level grade in a row, while a press headline says the tenth.
- Conflicting sources. Baltimore Oyster Partnership counts differ by definition (over 1.6 million oysters versus over 1.3 million spat-on-shell). The ShoreRivers bacteria blitz share and the Prince George’s permit progress were not re-derived and appear only in body text, attributed. No GAO, EPA inspector general or state audit of any project here was found.
- Conflicting sources. When the new state plans are due. The 2025 Agreement’s sentence can be read as plans by 2040 or as targets met by 2040; EPA’s 2025 Assessment reads it as plans by 2030 and reductions by 2040.
Sources (19)
- University of Maryland Center for Environmental Science: Chesapeake Bay Report Card, Bay health page and its Bay Health Index data, 1986–2024
- Waterfront Partnership of Baltimore: Healthy Harbor report card data: ecosystem health 2010–2024 and recreational health 2011–2024 (published sheet); 2025 water quality update; 2020 Harbor Heartbeat report; Mr. Trash Wheel family collection data (published sheet), 2014–2026; Annual Report FY2023
- Anacostia Watershed Society: State of the River report card (2026)
- DCist: Anacostia River gets a failing grade (September 28, 2023)
- The Wash: Anacostia River report card coverage (2018)
- Potomac Conservancy: 2025 Potomac River report card press page; Report card archive
- James River Association: State of the James 2025; State of the James 2025 indicator narratives and graphs; State of the James 2023 release (October 26, 2023); State of the James 2021; State of the James 2013
- Elizabeth River Project: State of the River 2023 with appendix; Money Point slide deck, Engineering With Nature knowledge series (November 20, 2025); Money Point page
- ShoreRivers: Choptank River report card 2025; Chester River report card 2025; Swimmable ShoreRivers program achieves Tier III status (2026)
- District Department of Energy and Environment: Anacostia River Sediment Project Interim Record of Decision announcement (September 30, 2020); Anacostia River Sediment Project fact sheet (October 7, 2020); Benning Road site consent decree page; 2026 litter data card
- District of Columbia: Q&A for the Leadership Council for a Cleaner Anacostia River (June 8, 2023)
- DC Water: Potomac Interceptor collapse page; Combined sewer overflow quarterly report, fourth quarter 2025
- U.S. Department of Justice: Justice Department files Clean Water Act complaint against DC Water (April 20, 2026)
- Maryland Attorney General: Lawsuit against DC Water over Potomac Interceptor collapse (April 20, 2026)
- Prince George’s County: FY2024 financial assurance plan (Maryland Department of the Environment)
- Baltimore Oyster Partnership: Baltimore Oyster Partnership
- EPA: 2025 Assessment of Chesapeake Bay TMDL progress
- The White House: Executive Order 14428 (September 16, 2026)
- District Office of Contracting and Procurement: RFP-2025-3128, Anacostia River Sediment Project (solicitation listing)
Read next
- Conowingo Dam and the Dredging Islands
- The Chesapeake and the Region’s Waters In the 2025 model run the watershed had made 57% of the required nitrogen reduction, 90% of the phosphorus and 100% of the sediment
The Chesapeake and the Region’s Waters, part 8 of 10.