The Capital Region

The Cleanup Shortfall and Coming Deadlines

What the Bay’s pollution limit still requires after 2025; Pennsylvania holds 87% of the nitrogen gap but none of the dated legal requirements ahead.

6 min read · 7 exhibits

The 2025 targets for the Chesapeake Bay were the partnership’s own deadline under its accountability framework, not a court order. In the 2025 model run the jurisdictions that missed their nitrogen targets were short by a combined 34.9 million lb a year, and Pennsylvania held 86.5% of it (Chesapeake Bay Program, 2025 modeled load workbook). The Bay Scorecard tells how that score is kept; this last study of the ten asks what is still owed, what dated commitments now stand against it, and which parts of the cleanup cannot yet be measured at all.

Three instruments sit behind the dates ahead and they carry different force. The Bay TMDL of 2010 is the legal pollution limit. Stormwater permits, sewer consent decrees and state statutes set enforceable dates for particular owners. The 2025 Watershed Agreement, adopted in December 2025, is a voluntary compact: it keeps the current targets until they are revised by December 31, 2030 and asks for plans to meet the revised targets by 2040 (Chesapeake Bay Watershed Agreement, 2025). Every exhibit below that mixes the two keeps legal requirements and voluntary goals apart.

What is still owed

Measured as the share of each jurisdiction’s own 2025 modeled load, the remaining cut is under 7% everywhere except Pennsylvania (28% of nitrogen, 23% of phosphorus), Delaware’s nitrogen (17%) and New York’s phosphorus (14%). Pennsylvania would need to take 28.2% off its nitrogen and 23.1% off its phosphorus to reach its 2025 targets; Virginia 4.7% and 3.0%; Maryland 0.35% of its nitrogen and none of its phosphorus. The District’s modeled nitrogen load is 0.95 million lb a year under its target. These are modeled loads under average weather, scored against the 2025 interim targets with the climate adjustment; Nitrogen From Farms shows that most of Pennsylvania’s gap is on farms.

123. To reach its 2025 targets Pennsylvania must still cut 28.2% of its modeled nitrogen and 23.1% of its phosphorus; Virginia 4.7% and 3.0%, while the District and Maryland have met theirs or nearly so

Full size

Source. Chesapeake Bay Program, Modeled Load Reduction Indicator, 2025 data workbook (Overview of States), 2026.

Method. Cut still needed = (2025 modeled load − 2025 interim target with the climate adjustment) ÷ 2025 load; “met” where the load is at or below the target. Modeled, average hydrology.

The dated legal requirements ahead fall where the gap is smallest. Of the 28 legal deadlines between now and 2040 in the group’s calendar of dated events (stormwater permit terms, sewer decrees, plant upgrades and state statutes), 14 are in Maryland, 11 in Virginia and 3 in the District, which together hold 7.8% of the nitrogen shortfall. None is in Pennsylvania. Its 2018 municipal stormwater general permit has not been reissued, and its 2026–27 Bay milestones are programmatic: none of their stated outcomes is a number of pounds (Pennsylvania DEP, 2026–27 milestone commitments, May 2026).

Full size

Source. Chesapeake Bay Program, 2025 modeled load workbook, 2026; legal requirements: Higgins Strategy calendar of dated events (permits, decrees, statutes), with each source document listed in Exhibit 126’s CSV.

Method. Shortfall = sum of positive gaps to the 2025 nitrogen targets (34.9 million lb a year, modeled). Legal requirements counted once per dated deadline, October 20, 2026 to 2040, Bay watershed only; reports, meetings and construction projections are left out. Left out of the drawing and kept in the table: the Bay-wide and Conowingo plan rows, which carry voluntary goals only, and the voluntary-goal column.

Where a dated commitment exists, how much of what remains would it deliver? The answer splits along the legal line. Maryland’s county stormwater permits require restored acres, and the state’s own projection has the ten largest counties finishing above their requirement by permit end, with Baltimore City the one short (Every Impervious Acre has the county detail). The nutrient commitments are another order of size. The Conowingo plan’s 2026–27 milestones count 244,250 lb of nitrogen a year from contracts already awarded, 3.6% of the 6.7 million lb the plan says is needed (Conowingo WIP 2026–27 milestones); Conowingo Dam and the Dredging Islands follows those contracts. Virginia’s pay-for-outcomes pilot aims at 38,600 lb by 2027 (EPA evaluation of Virginia’s milestones) against a 2.56 million lb shortfall.

125. Stormwater permits have dated plans for most of the acres still owed; the Conowingo plan’s milestones cover 3.6% of its nitrogen need, and Pennsylvania’s state no pounds at all

Full size

Source. MDE, Financial Assurance and the WPRP, October 2025; Montgomery County MS4 annual report FY2025; MDE review of Baltimore City FY2024 FAP; Conowingo WIP 2026–27 milestones; EPA evaluation of Virginia’s 2026–27 milestones; Pennsylvania DEP 2026–27 milestones; Chesapeake Bay Program 2025 workbook.

Method. Share = what the commitment would deliver ÷ what remains. Acres: required minus restored at the last report (Maryland FY2024; Montgomery FY2025). Pounds: nitrogen per year against the 2025 shortfall (workbook) or the Conowingo plan’s stated need. Units differ by row; shares do not.

The calendar ahead

Counted by year, the commitments ahead form two blocks. The legal ones are front-loaded: 26 of the 28 fall by the end of 2030, when the District’s Potomac River Tunnel is due in operation (February 8, 2030, in DC Water’s Q2 2026 decree report), Maryland’s current county permits run out and Baltimore’s sewer decree reaches its present deadline. After 2030 the calendar is mostly voluntary, and 8 of the 18 voluntary goals carry the year 2040, the Agreement’s new horizon. Pipes and Tunnels and Rivers and Harbors list the individual dates for their projects.

126. 26 of the 28 dated legal requirements ahead fall by the end of 2030; after 2030 the calendar is mostly voluntary, and 8 of 18 voluntary goals are dated 2040

Full size

Source. Higgins Strategy calendar of dated events, with the source document for each listed in the exhibit CSV; DC Water, LTCP consent decree quarterly report, Q2 2026; Chesapeake Bay Watershed Agreement, 2025.

Method. Legal: permit terms, consent-decree and statutory deadlines. Voluntary: Watershed Agreement goals, two-year milestones, partnership and nonprofit goals. The dates for revising targets and new state plans come from the Agreement and are counted as voluntary; the TMDL allocations themselves are the legal limit.

Dates move. Where both an original and a current date are documented, the legal ones have moved later. The District’s sewer decree moved its final compliance from 2025 to 2030 under an amendment proposed in 2015 (Federal Register notice, May 26, 2015). Baltimore’s sewer decree of 2002 was due in January 2016, was modified to run to December 2030 (MDE), and the city has now proposed 2046, which the regulators have not accepted (Baltimore Brew, September 3, 2025). One goal moved the other way: the District’s target for a swimmable Anacostia was brought forward from 2032 to 2027 (The Wash).

127. Where legal deadlines have moved, they have moved later: the District’s sewer decree from 2025 to 2030, and Baltimore has asked to move its decree end from 2030 to 2046

Full size

Source. Federal Register, proposed amendment to the DC Water consent decree, 2015; DC Water decree report Q2 2026; MDE, modified Baltimore consent decree; Baltimore Brew, 2025; Baltimore MCD quarterly report 34; HRSD decree, Seventh Amendment; ALXnow; Watershed Agreement 2025; Chesapeake Bay Magazine; The Wash; AJOT, 2021; USACE via DVIDS; Loudoun County.

Method. Open circle: first documented date; filled: current date; dashed: proposed, not approved. Baltimore’s last four overflow structures: decree date against the city’s projection. Baltimore Harbor set a 2030 vision after its 2020 goal passed. Bay targets: the 2025 deadline against the Agreement’s 2040 date for plans to meet revised targets.

The new Agreement also resets what counts as finished. Its 2040 habitat goals keep or slightly raise the grass, riparian forest and fish-passage targets of 2014, but its wetland goals are a fraction of the old ones: 6,000 acres created or restored and 30,000 enhanced, tidal and nontidal combined, against 85,000 and 150,000 (Agreement; Bay Barometer 2024–2025). The final Barometer reported 4,862 acres created under the 2014 goal, 5.72% of it. Executive Order 14428 of September 2026 revoked the 2009 federal Bay order and set no deadlines of its own (91 FR 59975). All of these habitat goals are voluntary.

128. The revised Agreement keeps the grass, forest and fish-passage goals of 2014 or raises them slightly, but sets its 2040 wetland goals at 7% and 20% of the 2014 figures

Full size

Source. Chesapeake Bay Watershed Agreement, 2025; Chesapeake Bay Program, Bay Barometer 2024–2025 (2014 outcomes).

Method. Revised goal ÷ 2014 goal. Wetland goals sum the separate tidal and nontidal targets: 3,000 acres restored or created and 15,000 enhanced, each, by 2040. Brook trout: 2014 goal is occupied habitat, revised goal is occupancy; the comparison is approximate. Both Agreements are voluntary.

What cannot yet be measured

What remains lacks a price in most places. Among twelve remaining physical goals in the Bay and the Capital Region for which the group looked for a cost to finish, a published figure exists for 2: Maryland’s ten county stormwater permits, where MDE projects $956.8 million to permit end, and one Virginia county’s second-cycle plan. A third, the State Highway Administration permit, has only a press figure. No cost to finish was found for the District’s permit, for the developed-land nitrogen gap, or for any of the Agreement’s 2040 habitat goals.

129. A cost to finish is published for 2 of 12 remaining goals in the Bay and Capital Region, and for none of the Agreement’s 2040 habitat goals

Remaining goalWhat remainsCost to finishStatus
Maryland’s ten county stormwater permits21,166 acres projected by permit end$956.8 million (MDE)found
Prince William County, Virginianitrogen from 49% to about 60% of its reduction$23.16 millionfound
Maryland State Highway Administration4,092 acres by about 2030$216 million (press; not confirmed)partial
DC stormwater permit848 acres managed by Dec 2028not foundnone
Developed land, Bay-wide2.887 million lb nitrogen over plannot foundnone
Developed land, Pennsylvania1.386 million lb nitrogen over plannot foundnone
Oyster reefs2,000 more acres by 2040no program budgetnone
Underwater grasses90,000 acres by 2030not foundnone
Forest buffers and trees7,500 buffer acres a year; 45,000 tree acresno Bay-wide costnone
Wetlands and living shorelines6,000 created, 30,000 enhanced by 2040not foundnone
Fish passage150 miles every two yearsnot itemizednone
Poplar Islandhabitat complete by 2041cost to complete not foundnone
Full size

Source. MDE, October 2025; Prince William County Phase II TMDL action plan (July 2026); Maryland Matters (SHA); Chesapeake Bay Program 2025 workbook; Watershed Agreement 2025; remaining rows: Higgins Strategy record of cost-to-finish searches, with the documents opened for each in the exhibit CSV.

Method. Status: found, a published cost to finish; partial, a figure from secondary reporting only; none, none found in the documents opened.

Taken together, the group’s findings point to two practical steps, neither of them new. Give the largest remaining source a dated, numeric commitment of the kind the stormwater permits already carry. And attach costs to the 2040 goals before 2030, when the targets are rewritten.

Limitations (8)

  • Revisions. The size of the remaining gap after 2025. Planning targets are to be revised by December 31, 2030 and the Phase 7 model is expected around 2028; the gap shown here is against the 2025 interim targets on the current model and will be restated.
  • Conflicting sources. The Potomac River Tunnel date. Some summaries give March 23, 2030. DC Water’s Q2 2026 decree report lists February 8, 2030 as the calendar deadline to place the Potomac Storage Tunnel in operation; March 23, 2030 in the same report is the in-operation date for Rock Creek green infrastructure Project D.
  • Unverified. Virginia’s pay-for-outcomes pilot. The 6,300 lb (2026) and 38,600 lb (2027) goals are in EPA’s evaluation of Virginia’s milestones, which could not be reopened for this page; whether the 2027 figure includes the 2026 one is not stated.
  • Conflicting sources. District stormwater acres. The District’s 2025 MS4 annual report tabulates acres managed by basin for 2024 and 2025 that sum to more than the 326.71 acres quoted elsewhere; the basis of each figure is not reconciled here, so the District is not charted in Exhibit 125.
  • Unverified. Baltimore’s 2046 date is the city’s proposal in its Phase II plan of December 2025; no EPA or MDE decision on it was found.
  • Unverified. Pennsylvania commitments. Its May 2026 programmatic milestones state no pounds; a separate numeric milestone document for 2026–27, if one exists, was not found.
  • Coverage. The calendar is the group’s compilation from primary documents and is not a complete list of every permit in the watershed; Pennsylvania’s municipal stormwater permits, administratively extended, carry no new dated requirement in it.
  • Conflicting sources. When the new state plans are due. The 2025 Agreement’s sentence can be read as plans by 2040 or as targets met by 2040; EPA’s 2025 Assessment reads it as plans by 2030 and reductions by 2040.

Sources (20)

  1. Chesapeake Bay Program: Modeled Load Reduction Indicator, 2025 data workbook (June 24, 2026); Chesapeake Bay Watershed Agreement (revised, December 2025); Bay Barometer 2024–2025 (March 2026); Conowingo WIP Steering Committee, programmatic two-year milestone commitments, January 1, 2026–December 31, 2027
  2. U.S. Environmental Protection Agency: 2025 Assessment of the Chesapeake Bay Program partnership’s progress toward the 2025 water quality goal (August 13, 2026); Evaluation of Virginia’s 2024–2025 and 2026–2027 milestones (August 13, 2026)
  3. Federal Register: Executive Order 14428, 91 Federal Register 59975 (September 21, 2026); Notice of proposed amendment to the DC Water consent decree (May 26, 2015)
  4. Pennsylvania Department of Environmental Protection: Chesapeake Bay programmatic two-year milestone commitments 2026–2027 (May 2026)
  5. DC Water: LTCP Consent Decree quarterly report, Quarter 2, 2026 (July 2026)
  6. Maryland Department of the Environment: Modified Baltimore sanitary sewer consent decree release; Financial Assurance and the Watershed Protection and Restoration Program (October 2025); Review of Baltimore City FY2024 financial assurance plan (May 2025)
  7. City of Baltimore Department of Public Works: Modified Consent Decree quarterly report no. 34 (2026)
  8. Baltimore Brew: “Scott administration seeks to push back the sewer consent decree deadline from 2030 to 2046” (September 3, 2025)
  9. HRSD: Seventh Amendment to the wet weather consent decree (2026)
  10. ALXnow: RiverRenew statutory deadline
  11. Chesapeake Bay Magazine: Baltimore report shifts swimmable-by-2020 goal to 2030
  12. The Wash: Anacostia swimmable target
  13. U.S. Army Corps of Engineers: Mid-Bay Island contract award, via DVIDS (April 2026)
  14. American Journal of Transportation: MDOT MPA and Army Corps complete Poplar Island construction (January 2021)
  15. Loudoun County: Westpark property stream restoration project page
  16. Montgomery County Department of Environmental Protection: MS4 annual report FY2025
  17. Prince William County: FY2025 Phase II Chesapeake Bay TMDL action plan (revised July 6, 2026)
  18. Maryland Matters: State Highway Administration stormwater permit
  19. District Department of Energy and Environment: District of Columbia MS4 annual report 2025
  20. Higgins Strategy, Capital Region water research package: calendar of dated events and record of cost-to-finish searches (October 2026)

Read next

  • The Chesapeake and the Region’s Waters In the 2025 model run the watershed had made 57% of the required nitrogen reduction, 90% of the phosphorus and 100% of the sediment
  • The Bay Scorecard In the 2025 model run the watershed had made 57% of the required nitrogen reduction, 90% of the phosphorus and 100% of the sediment

Updated November 14, 2026 · Data as of October 20, 2026.

Data for every exhibit: download (CSV)

Corrections

  • Part 10: Delaware’s nitrogen and New York’s phosphorus, as well as Pennsylvania, have large cuts remaining.

The Chesapeake and the Region’s Waters, part 10 of 10.

Next: Study XXX, What DC’s Sewer Tunnels Bought