The District’s interim Anacostia sediment cleanup covers about 77 acres in 11 PCB hot spots at an estimated $35.5 million, which DOEE says would cut human-health risk from PCBs by about 90%
Source. District Department of Energy and Environment, Anacostia River Sediment Project fact sheet (October 2020) and Interim Record of Decision announcement (September 30, 2020); estimated
Method. The main stem and Kingman Lake areas are to be dredged and capped and the Washington Channel areas capped. Costs are the decision’s estimates, not contract values. The decision is interim; a final river-wide decision is to follow monitoring.
| Early action areas | Acres | Estimated cost ($ million) |
|---|---|---|
| Main stem (6 areas) | 44 | 19.5 |
| Kingman Lake (3 areas) | 6 | 7 |
| Washington Channel (2 areas) | 27 | 9 |
| Total (11 early action areas) | 77 | 35.5 |