Building and keeping

This section shows the building side. Maryland’s 11 Phase I municipal storm sewer jurisdictions reported spending that came to $5,155 an acre in capital and $12,500 an acre with operation included over 2009–2011, the Maryland Department of the Environment calculated from 33,424 acres retrofitted (Exhibit 17). A 2012 Baltimore case study put detention ponds that remove the same nitrogen as a foot of restored stream at $30 to $120 per foot of stream.

17. Maryland put the cost of treating an acre at $12,500 with upkeep; the state puts Ellicott City’s 2016 flood losses at upwards of $67 million

ItemPlaceKindLowHighUnitSource
Urban stormwater practices, capital onlyMaryland Phase I MS4 jurisdictionsbuild5,1555,155dollars per acre treatedMaryland Phase II WIP, Appendix C (MDE, 2012)
Urban stormwater practices, capital plus operationMaryland Phase I MS4 jurisdictionsbuild and keep12,50012,500dollars per acre treatedMaryland Phase II WIP, Appendix C (MDE, 2012)
Urban stream restoration (planning rate)Marylandrepair285285dollars per footMaryland Phase II WIP, Appendix C (MDE, 2012)
Urban stream restoration (range)Chesapeake Bay watershedrepair150400dollars per footChesapeake Bay Program, U-4 Urban Stream Restoration
Urban stream restoration (typical)Baltimore, Md. case studyrepair5001,200dollars per footKenney et al. 2012, Journal of the American Water Resources Association
Detention ponds, nitrogen equivalentBaltimore, Md. case studybuild30120dollars per foot of streamKenney et al. 2012, Journal of the American Water Resources Association
Rip-rap bank armoringBaltimore, Md. case studyrepair0120dollars per footKenney et al. 2012, Journal of the American Water Resources Association
Ellicott City flood of July 30, 2016, economic lossesHoward County, Md.damage67,000,00067,000,000dollars (upwards of)Maryland Department of the Environment, October 22, 2025
Ellicott City Safe and Sound plan, funding secured to dateHoward County, Md.repair300,000,000300,000,000dollars (more than)Howard County Government, September 10, 2025
Full size

Source. Maryland Department of the Environment, Phase II WIP Appendix C, Cost Analyses and Funding Studies (October 15, 2012); Chesapeake Bay Program, U-4 Urban Stream Restoration fact sheet (draft, March 25, 2015); Kenney, Wilcock, Hobbs, Flores and Martínez, “Is Urban Stream Restoration Worth It?,” Journal of the American Water Resources Association 48(3) (2012); Maryland Department of the Environment, news release, October 22, 2025; Howard County Government, news release, September 10, 2025.

Method. Each row is the source’s own figure in its own year’s dollars; rows are not adjusted for inflation or added together.

A narrow stream channel between concrete-block walls in a bare winter woodland, seen from a rusted railing.

Watts Branch, a tributary of the Anacostia River in Washington, D.C., on February 14, 2011, before restoration, running between concrete walls.

Photo: U.S. Fish and Wildlife Service, United States government work.

A small stream with rock-lined banks flowing between green trees and grass.

Watts Branch in Washington, D.C., on August 19, 2011, after restoration.

Photo: U.S. Fish and Wildlife Service, United States government work.

Repair and damage

This section shows the other side. Published costs to restore a foot of urban stream run from $150 to $400 in a Chesapeake Bay Program fact sheet, $285 in Maryland’s 2012 planning estimate and $500 to $1,200 in the Baltimore case study, which also found rip-rap armoring at $0 to $120 a foot (Exhibit 18).

Damage arrives in single events. The Maryland Department of the Environment puts the economic losses from Ellicott City’s flood of July 30, 2016, at upwards of $67 million, and Howard County reports more than $300 million in funding secured for its plan of five ponds, a tunnel and culverts there.

18. Published costs to restore a foot of urban stream run from $150 to $1,200; rip-rap armoring runs up to $120

Full size

Source. Chesapeake Bay Program, U-4 Urban Stream Restoration fact sheet (draft, March 25, 2015); Maryland Department of the Environment, Phase II WIP Appendix C, Cost Analyses and Funding Studies (October 15, 2012); Kenney, Wilcock, Hobbs, Flores and Martínez, “Is Urban Stream Restoration Worth It?,” Journal of the American Water Resources Association 48(3) (2012).

Method. Ranges as published; a single figure is drawn as a dot.

Limitations (4)

  • Method. Costs are in the dollars of each source’s year and are not adjusted; the Maryland figures cover 2009–2011 and the Baltimore study was published in 2012.
  • Unverified. The Chesapeake Bay Program’s $150 to $400 per foot comes from a fact sheet marked draft, dated March 25, 2015.
  • Coverage. No named regional source was found that prices dredging or drinking-water treatment attributable to stormwater; those costs are not in this part.
  • Coverage. Flood insurance claims are left to a separate study; the Ellicott City figures are a single place and are not a regional total.

Sources (5)

  1. Maryland Department of the Environment, Phase II WIP Appendix C, Cost Analyses and Funding Studies (October 15, 2012)
  2. Chesapeake Bay Program, U-4 Urban Stream Restoration fact sheet (draft, March 25, 2015)
  3. Kenney, Wilcock, Hobbs, Flores and Martínez, “Is Urban Stream Restoration Worth It?,” Journal of the American Water Resources Association 48(3) (2012)
  4. Maryland Department of the Environment, news release, October 22, 2025
  5. Howard County Government, news release, September 10, 2025

Read next

A principal of Higgins Strategy is employed by a contractor in the regional stormwater market. No figure in this study was obtained through that employment, and no company was added to or removed from the data on that account.

One Inch of Rain on One Acre, part 5 of 5.

Next: Study XXXIII, Where the Pavement Grew