From Study XXI, Exhibit 19

HRSD’s James River nitrogen fell from 3.72 million lb delivered in 2017 to 1.78 million in 2025; 83.5% of the drop is one point that stopped reporting

Source. EPA ECHO, Virginia Watershed General Permit aggregate VAN040090 (HRSD, James River basin), 2017–2025.

Method. Delivered load is reported effluent mass adjusted by Virginia’s delivery factors and summed across HRSD’s James basin plants; 2023–25 are sums of monthly loads. The light line excludes internal monitoring point 507 (2,098,993 to 1,777,836 lb), which reported 1,624,872 lb in 2017 and no discharge from January 2022. The limit fell from 4.55 to 3.55 million lb in 2022.

YearDelivered nitrogen (lb)Limit (lb)Basis
20173,723,8654,553,500reported
20183,604,6894,553,500reported
20193,574,6894,553,500reported
20203,648,9374,553,500reported
20212,834,4244,553,500reported
20221,917,5393,549,300reported
20231,820,9393,550,470reported
20242,071,4383,550,470reported
20251,777,8363,550,470reported
2017 excl. point 5072,098,993derived (independent verification)
2025 excl. point 5071,777,836derived (independent verification)

Download pipes-and-tunnels-07-hrsd-james-river-delivered-nitrogen.csv

Download SVG · CSV. Data and chart licensed CC BY 4.0.