Baltimore’s Phase II Plan records 84 million gallons of wet-weather sewer overflow in 2020, 26 million in 2021 and 5.7 million in 2022
Source. City of Baltimore DPW, Modified Consent Decree Phase II Plan (January 2023); quarterly consent-decree reports, 2023–2025, Attachment 1.
Method. Reported overflows, not modeled. 2020–22 are the Plan’s own figures; 2023–25 are tallies of every wet-weather row in the quarterly listings, so the two halves come from different documents and possibly different wet-weather rules. Structures #67 and #72 carried 14.36 million gallons in 2023 and 31.83 million in 2024 (81% of the 2024 tally). Separately, the city’s model puts overflow over a 20-year typical rainfall at 2.4 billion gallons for 2002 conditions and 235 million in its “Baseline 2030” simulation.
| Year | Wet-weather overflow (million gallons) | Document | Structures 67 and 72 (million gallons) | Basis |
|---|---|---|---|---|
| 2020 | 84 | Phase II Plan | reported | |
| 2021 | 26 | Phase II Plan | reported | |
| 2022 | 5.7 | Phase II Plan | reported | |
| 2023 | 19.15 | quarterly listings | 14.36 | derived from reported listings |
| 2024 | 39.48 | quarterly listings | 31.83 | derived from reported listings |
| 2025 | 5.45 | quarterly listings | 0.73 | derived from reported listings |
| 2002 conditions, 20-year typical rain | 2,400 | Phase II Plan | modeled | |
| Baseline 2030 simulation, 20-year typical rain | 235 | Phase II Plan | modeled |