The Capital Region

How Bioretention Became the Stormwater Standard

The rise of planted cells over engineered soil from a Maryland subdivision about 1990; developed land’s nitrogen load rose 5% from 2009 to 2025.

7 min read · 7 exhibits

A bioretention cell is a planted depression over a bed of engineered soil. Runoff from a roof, a parking lot or a street ponds on the surface, soaks through the soil, and either seeps into the ground or leaves through a perforated pipe at the bottom. The idea was worked out in Prince George’s County, Maryland, in the early 1990s, as a cheaper way to handle a subdivision’s rain than ponds, curbs and gutters. Thirty years on it is the default small-site practice across the Chesapeake Bay watershed: written into Maryland’s stormwater law, Virginia’s design specifications and the District’s retention rule, and credited pound for pound in the Bay cleanup.

1. From a county experiment to the watershed’s default practice, 1990–2025

Full size

Source. Prince George’s County (1993, 2007); Coffman et al., ASCE (1993); USPTO 6,277,274 and 6,569,321; Virginia DEQ Specification No. 9; Chesapeake Bay Program expert panel reports (2012, 2015); MDE; DOEE; DC Water; Maryland Association of Counties; UMCES TS-772-21; Bay Journal (October 5, 2026).

Method. The 2000 and 2007 Maryland dates are as cited in the literature; the manual and the statute were not opened. Events marked in green are the ones this study treats as turning points.

The record starts with a developer’s problem. At Somerset, each house got a rain garden of 300 to 400 square feet and the subdivision skipped the pond. EPA later put the saving at $916,382 against a conventional design, or $4,604 a lot. The county’s 1993 manual was cautious: it limited the practice to soils that drain quickly. Coffman and his colleagues put the practice’s drainage areas at a quarter acre to an acre, and the original guide, as they cite it, sized the garden at about a tenth of the area draining to it.

The first measured failure came five years later. The county’s 1998 optimization study found the design could not remove nitrate and in fact raised it, because the soil stayed aerobic and the nitrogen that entered left as nitrate. That finding drove the next twenty years of design changes: saturated zones at the bottom of the cell to starve the water of oxygen, lower-phosphorus soil mixes, thinner mulch. Part 2 follows that thread.

One practice became tiers

By 2011 the practice had split by design quality. Virginia’s Specification No. 9 credits a Level 1 cell with removing 40 percent of the runoff that reaches it and a Level 2 cell, with a quarter more storage, deeper media and no underdrain where soils allow, with 80 percent. Each level also gets a separate credit for cleaning the water that does pass through. Multiply the two and the modeled total removal for phosphorus runs from 55 percent at Level 1 to 90 percent at Level 2. Urban planters, tree boxes and curb extensions qualify only for Level 1.

2. Virginia credits a Level 2 cell with twice the runoff reduction of Level 1

Full size

Source. Virginia DEQ, Stormwater Design Specification No. 9, Bioretention (v1.9, March 1, 2011; v2.0, January 1, 2013).

Method. Credits are modeled design values under the Virginia Runoff Reduction Method, not measurements. Total removal is derived as 1 − (1 − runoff reduction) × (1 − treatment credit).

The family has also multiplied. Maryland now codes rain gardens, micro-bioretention, bioretention, bioswales and the step-pool conveyances invented in Anne Arundel County as separate practices. They differ mostly in size, and size sets the price. Across Maryland project records the median cost to treat one impervious acre was about $17,000 with a sand filter, $48,000 with a wet pond, $132,000 with rain gardens, $189,000 with bioretention and $278,000 with micro-bioretention; permeable pavement, with two projects, was highest at $349,000. The smaller and more urban the practice, the more it costs per acre treated.

3. Median construction cost per impervious acre treated, by Maryland practice code

Full size

Source. Price, Flemming and Wainger, Cost Analysis of Stormwater and Agricultural Practices for Reducing Nitrogen and Phosphorus Runoff in Maryland, UMCES TS-772-21 (March 2021), Table 15.

Method. Medians of reported project costs by MDE practice code, in 2017 dollars, with each code’s project count from Table 15. Permeable pavement rests on two projects; the micro-bioretention median rests on four, with costs from $101,395 to $5.6 million per acre.

How much has been built

The clearest count of the effort is Maryland’s. The 2014 Phase I permits told the state’s ten largest jurisdictions to restore 20 percent of the pavement that drained untreated into storm sewers. By the time the permits expired (Montgomery County’s count is as of October 2019) they had restored 32,204 of 34,768 required acres, 93 percent in aggregate. Nine of the ten met or beat the target; Howard County restored 132 percent of its requirement. Prince George’s County reached 39 percent, 2,387 of 6,105 acres, and in December 2021 entered a consent decree with a $475,000 penalty.

“Restored acres” is a credit, not a count of rain gardens. It includes stream restoration, street sweeping, tree planting and purchased nutrient credits as well as structural practices; Frederick County met 708 of its 1,981 required acres, 36 percent, by buying nutrient credits.

4. Restoration under the 2014 permits: share of the 20 percent requirement met

Full size

Source. Maryland Department of the Environment, 2024 Stormwater Financial Assurance Plan Annual Report (MSAR #10954).

Method. Acres restored by permit expiry against the 20 percent impervious-area restoration requirement of the 2014 permits. Restored acres are MDE accounting credits across all approved practices.

5. A quarter of the baseline pavement carried a restoration credit by fiscal 2023

Full size

Source. Maryland Department of the Environment, 2024 Stormwater Financial Assurance Plan Annual Report.

Method. Cumulative restored impervious acres (42,964 in total) divided by each jurisdiction’s impervious-area baseline, as reported for fiscal 2023.

Prince George’s County answered its shortfall with a thirty-year public-private partnership. The Clean Water Partnership with Corvias, signed in March 2015, finished a 2,000-acre pilot across 94 projects in 36 months and by March 2026 reported 4,658 completed credit acres across 428 sites, with $329.6 million of program costs expended and $257.2 million of it (78 percent) in local and minority business participation. The county’s MS4 permit requires it to retrofit roughly 15,000 impervious acres by 2025 at an estimated $1.2 billion. Those are the partnership’s and the county’s figures; no independent audit was found.

The District took a different route. Its 2013 rule requires new and redeveloped sites to retain the first 1.2 inches of rain and lets them meet part of that obligation by buying Stormwater Retention Credits from anyone who builds retention elsewhere. The first trade, in September 2014, moved 11,013 credits for about $25,000, generated by rain gardens that had cost about $75,000 to build. By October 2024 more than $1.7 million of credits had changed hands at an average of $1.41 a credit, and the city stands ready to buy at a locked price. Homeowner programs sit alongside: RiverSmart Homes has installed 1,652 rain gardens and 7,935 rain barrels since 2008 for a $200 copay per 50 square feet of garden, and Montgomery County’s RainScapes pays $10 a square foot for a rain garden, up to $7,500 per residential property.

The comparator up the road

Philadelphia, outside the Bay watershed but in the same climate and clay, made green infrastructure the center of its sewer-overflow plan in 2011. Green City, Clean Waters promises 9,564 “greened acres” by 2036, an acre being an impervious acre whose first inch of rain is managed. The city has kept pace with the schedule: 2,196 acres against a Year 10 target of 2,148, and more than 3,850 against the Year 15 target of 3,812. The budget has not kept pace with itself, from $2.4 billion in 2011 to $4.5 billion in 2021; Part 3 takes up the cost per acre.

6. Philadelphia’s greened acres: the schedule and the count so far

Full size

Source. Philadelphia Water Department, “15 Years of Green City, Clean Waters” (2026); William Penn Foundation, Sustainable Funding for Philadelphia’s Green City, Clean Waters Plan.

Method. Targets are the consent-order milestones. The Year 15 achieved figure is reported as “more than 3,850”; 3,850 is charted. A greened acre is a credited unit of managed impervious area, not a count of installations.

The acres rose; the urban load did too

The reason to build any of this is the Bay. By the Bay Program’s model the watershed delivered about 237 million pounds of nitrogen in 2025, 12 percent less than in 2009, against a goal of 25 percent less. Agriculture, at 116 million pounds, was down 4 percent. Nearly two-thirds of the reduction came from sewage plants. Developed land went the other way: its nitrogen load in 2025 was about 5 percent above 2009, and septic systems were about 3 percent above. Tens of thousands of credited acres have not yet offset the pavement added since the TMDL was set. EPA’s 2024 evaluations found every jurisdiction but the District significantly off track in the urban and suburban stormwater sector.

Bioretention is the practice the region has chosen; whether it removes what it is credited with, and what it costs to keep removing it, decides whether the acres will ever show up in the river.

7. Change in modeled nitrogen load to the Bay, 2009 to 2025, by sector

Full size

Source. Bay Journal, “Decades later, a big gap persists for key Chesapeake Bay pollution goals” (October 5, 2026), reporting Chesapeake Bay Program model results.

Method. All loads are Chesapeake Bay Program model estimates (Phase 6), not measured river loads. Sector changes are as reported (“about 5% more,” “approximately 3%,” “down just 4%”).

Limitations (9)

  • Unverified. The Maryland dates for the 2000 Design Manual, the 2007 Stormwater Management Act and the 2009–2010 environmental site design rules are as cited in secondary sources; the manual and the statute were not opened.
  • Conflicting sources. Somerset’s savings are reported two ways: $4,604 a lot by EPA and “$4,000” in a later interview with the county’s designer. The EPA figure is used.
  • Conflicting sources. The Clean Water Partnership’s acreage is reported by the partnership’s dashboard, a county committee briefing and Corvias press releases; the three do not agree exactly (4,658 credit acres on the dashboard in March 2026, about 4,948 restoration acres in the briefing, “nearly 5,000” in a July 2026 release) and none has been independently audited. The 15,000-acre, $1.2 billion figure is the county’s MS4 permit requirement as EPA described it, not the partnership’s contract.
  • Unverified. The county committee briefing’s figures for the Clean Water Partnership (about $378 million spent, more than $270 million of it with minority-owned and local firms) could not be located at any address; this page uses the partnership’s own dashboard (updated March 2026) for both its spending and its acres.
  • Method. Maryland’s restored acres are permit-accounting credits across every approved practice, including stream restoration, street sweeping and purchased nutrient credits; the share that is bioretention is not broken out in the Financial Assurance Plan report.
  • Coverage. Acres of bioretention reported to the Bay Program by state and year (CAST) were not retrieved; the exhibits use Maryland’s MS4 accounting and Philadelphia’s greened acres instead.
  • Conflicting sources. The District’s rain garden rebate terms are published inconsistently ($41 a square foot of garden up to $3,000 on one DOEE page; $3 a square foot of treated area up to $2,200 elsewhere); only the installation copay is quoted.
  • Revisions. Bay nitrogen loads and sector changes are model estimates. A 2022 article in the same publication gives 270.8 million pounds for 2009 and 240.5 million for 2021 on an earlier model vintage; the 2026 figures are used throughout.
  • Unverified. The effective date of the District’s 2013 Stormwater Management Rule was not checked against the rule itself, and no monitoring data for Anne Arundel County’s step-pool conveyances were retrieved.

Sources (21)

  1. Coffman, Green, Clar and Bitter, Development of Bioretention Practices for Stormwater Management (ASCE, 1993; CHI JWMM R176-02, 1994)
  2. US Patent and Trademark Office: US Patent 6,277,274, recounting Prince George’s County’s 1993 manual and 1998 optimization study; US Patent 6,569,321
  3. EPA: Reducing Stormwater Costs through Low Impact Development: Municipal LID fact sheet (Somerset); Nutrient and Stormwater Trading Case Study: the District of Columbia’s Stormwater Retention Credit program (2020); Maryland 2022–2023 and 2024–2025 milestone evaluation (May 2024); Green Streets, Green Jobs, Green Towns: Prince George’s County Clean Water Partnership (archived)
  4. Green Building Alliance: Rain Gardens (Somerset’s 300- to 400-square-foot gardens)
  5. Chesapeake Quarterly: Vol. 2 No. 2, on Larry Coffman and low-impact development
  6. Davis, Hunt, Traver and Clar, Bioretention Technology: Overview of Current Practice and Future Needs, Journal of Environmental Engineering (2009)
  7. Virginia DEQ: Stormwater Design Specification No. 9: Bioretention, v1.9 (March 1, 2011); Stormwater BMP Clearinghouse
  8. Chesapeake Bay Program: Recommendations of the Expert Panel to Define Removal Rates for New State Stormwater Performance Standards (memo, July 9, 2012); Stormwater Performance Standards BMP expert panel report, approved January 2015
  9. Maryland Department of the Environment: Accounting for Stormwater Wasteload Allocations and Impervious Acres Treated (August 2014); 2024 Stormwater Financial Assurance Plan Annual Report (MSAR #10954); Frederick County FY20 Financial Assurance Plan (approved)
  10. Maryland Association of Counties: Conduit Street, “What’s in the Stormwater Fee Bill?” (April 16, 2015)
  11. Price, Flemming and Wainger, Cost Analysis of Stormwater and Agricultural Practices for Reducing Nitrogen and Phosphorus Runoff in Maryland, UMCES TS-772-21 (March 2021)
  12. Corvias and Prince George’s County: Clean Water Partnership dashboard, “By the Numbers” (updated March 2026); Clean Water Partnership completion announcements (2019, 2026)
  13. Urban Land Institute: Developing Resilience: DC Stormwater Retention Credit Program
  14. Green Finance Institute: DC Stormwater Retention Credit trading programme case study
  15. DOEE: RiverSmart Homes
  16. DC Open Data: RiverSmart Homes installations
  17. Montgomery County Department of Environmental Protection: RainScapes (rebate maximums); RainScapes: rain gardens
  18. DC Water: 2016 Green Bond Report (consent decree modification)
  19. Philadelphia Water Department: 15 Years of Green City, Clean Waters
  20. William Penn Foundation: Sustainable Funding for Philadelphia’s Green City, Clean Waters Plan
  21. Bay Journal: “Decades later, a big gap persists for key Chesapeake Bay pollution goals” (October 5, 2026)

Read next

Figures as published. The rows behind each exhibit are filed with the study as CSVs (br1-01 to br1-07).

Updated November 14, 2026.

Data for every exhibit: download (CSV)

Corrections

  • Part 1: the cost range named five practices and stopped at $278,000; the exhibit’s highest value is permeable pavement at $349,000.