From Study XXX, Exhibit 9

For the Piney Branch outfall, DC Water’s 2020 assessment put an all-green plan at $407 million over 30 years, against $211 million for storage and $207 million for the hybrid it chose

Source. DC Water, Practicability Assessment for Rock Creek Green Infrastructure, June 2020, Tables ES-4 and ES-5.

Method. Net present value over 30 years combines capital cost and operations and maintenance, in 2020 dollars, as DC Water computed it.

AlternativeControl volume (MG)Capital ($ millions)Operations and maintenance ($ millions a year)30-year net present value ($ millions)
All gray: 9.5-million-gallon storage9.51850.28211
All green: manage 365 impervious acres to the 1.2-inch retention standard9.52084.41407
Hybrid: targeted green infrastructure, 4.2-million-gallon storage, credit for District stormwater controls9.51331.49207