The Potomac River Tunnel, not to exceed $819.7M, is the largest wastewater contract in the region’s records; HRSD’s Nansemond SWIFT, $608.7M, is next
Source. DC Water Board resolutions 11-57, 13-56, 13-64, 17-45 and 23-54; HRSD Commission minutes, 2022–2025; Virginia DEQ report RD662 (2021); Water Tech Online (2013).
Method. Ranked by the figure approved: the original award for DC Water, AlexRenew and Baltimore, the stipulated price for HRSD design-build. The Potomac River Tunnel figure is a not-to-exceed ceiling. The Back River figure is from trade press and the RiverRenew figure from a state report. Coverage is four buyers; Richmond, Philadelphia and ALCOSAN contracts were not compiled.
| Contract | Title | Owner | Builder | Approved | Value ($) | Value basis |
|---|---|---|---|---|---|---|
| 200100 | Potomac River Tunnel Contract B, tunnel system construction (design-build) | DC Water | CBNA-Halmar Clean Rivers Joint Venture (design-builder (JV); members: CBNA (as written), Halmar (as written); shares not published) | 2023-10-05 | 819,655,177 | original |
| GN016380 | Nansemond SWIFT Facility: Stipulated Price | HRSD | Garney Companies, Inc. (prime contractor) | 2025-07-22 | 608,717,209 | final |
| 140150 | Northeast Boundary Tunnel | DC Water | Salini Impregilo S.A. Healy JV (prime contractor (JV); members: Salini Impregilo S.A., S.A. Healy Company; shares not published) | 2017-07-06 | 579,975,000 | original |
| GN016360 / JR013400 | James River SWIFT Facility and James River Treatment Plant Advanced Nutrient Reduction Improvements: Stipulated Price | HRSD | Ulliman Schutte-Alberici Joint Venture Team (US-A) (design-builder (JV); members: Ulliman Schutte Construction, LLC, Alberici Constructors, Inc.; shares not published) | 2022-05-24 | 534,098,839 | final |
| 19-079 | RiverRenew Tunnel System Project, design-build | AlexRenew | Traylor-Shea Joint Venture (design-builder (JV); members: Traylor Bros., Inc., J.F. Shea Co.; shares not published) | 2020-11-17 | 454,400,000 | original |
| 100040 | Blue Plains Tunnel, final design and construction (LTCP Division A) | DC Water | Traylor/Skanska/Jay Dee Joint Venture (prime contractor (JV); members: Traylor Bros., Inc., Skanska, Jay Dee Contractors; shares not published) | 2011-05-05 | 330,561,000 | original |
| NP013820 | Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II and SWIFT: Stipulated Price | HRSD | Garney Companies, Inc. (prime contractor) | 2023-02-28 | 299,233,922 | final |
| SC 877 | Enhanced Nutrient Removal at Back River WWTP, SC 877: construction (figure from news reports) | Baltimore City DPW (Board of Estimates) | Archer Western Contractors (prime contractor) | 2013-08 | 263,500,000 | original |
| 110140 | Anacostia River Tunnel | DC Water | Impregilo-Healy-Parsons JV (prime contractor (JV); members: Impregilo, Healy, Parsons; shares not published) | 2013-05-02 | 253,859,999 | original |
| 120070 | Tunnel Dewatering Pump Station and Enhanced Clarification Facility | DC Water | PC/CDM Joint Venture (prime contractor (JV); members: PC Construction Company, CDM Smith; shares not published) | 2013-06-06 | 214,931,000 | original |