From Study XX · Part 3 of 3, Exhibit 18

Annual maintenance as a share of construction cost: three generations of assumption

Source. Chesapeake Assessment Scenario Tool cost assumptions as reported in UMCES TS-772-21; King and Hagan, UMCES TS-626-11 (2011); UMCES TS-772-21 (2021).

Method. The UMCES 2021 figures follow Prince George’s County’s maintenance-intensity schedule (Exhibit 19). King and Hagan separately estimated $1,531 per impervious acre a year for bioretention upkeep.

SourceAnnual maintenance (% of construction cost)
CAST, low2.5
CAST, high6.0
King and Hagan (2011), low4.0
King and Hagan (2011), high7.0
UMCES (2021), stream restoration8.2
UMCES (2021), bioretention and other small practices11.5
UMCES (2021), infiltration and permeable pavement13.4

Download br3-04-maintenance-share-of-construction-assumptions.csv

Download SVG · CSV. Data and chart licensed CC BY 4.0.