From Study XXI, Exhibit 109

Conowingo plan contracts cover 256,692 pounds of nitrogen a year, 4.28% of the 6.0 million-pound goal and 15% of the 1.675 million pounds EPA expected by the end of 2025

Source. Chesapeake Bay Program, Conowingo WIP Reductions Summary workbook (May 11, 2026); Conowingo Watershed Implementation Plan (2021); EPA evaluation of 2026–2027 milestone commitments (April 15, 2026); CWIP 2022–2025 progress report (January 2026).

Method. The 6.0 million-pound goal and the 6.67 million-pound assignments are modeled loads; the contracted figure is annual pounds promised in contracts, including projects still in design, not reductions verified or credited. EPA’s 25% expectation is 25% of 6.7 million pounds.

MeasureNitrogen (lb a year)BasisSource URL
Assignments in the plan (2021)6,670,000modeledhttps://www.chesapeakebay.net/files/documents/final_cwip_2024-06-20-152643_gxnv.pdf
Goal: extra load from infill6,000,000modeledhttps://www.chesapeakebay.net/files/documents/final_cwip_2024-06-20-152643_gxnv.pdf
EPA: 25% by Dec. 31, 20251,675,000modeled (EPA expectation)https://www.epa.gov/system/files/documents/2026-04/epa_evaluation_of_conowingo_2026-2027_draft_milestone_commitments.pdf
Contracted, May 11, 2026256,691.76contractedhttps://www.chesapeakebay.net/files/CWIP-Reductions-Summary.xlsx
EPA: milestones 1–3 (Apr. 2026)245,300contracted (EPA count)https://www.epa.gov/system/files/documents/2026-04/epa_evaluation_of_conowingo_2026-2027_draft_milestone_commitments.pdf
Reported to EPA by June 30, 20250reportedhttps://www.chesapeakebay.net/files/documents/CWIP_22-25progress-report.pdf

Download the-dam-and-the-islands-01-goal-vs-contracted.csv

Download SVG · CSV. Data and chart licensed CC BY 4.0.