From Study XXI, Exhibit 7

Bay-wide nitrogen was published as 57%, 59% and 57% for 2023 to 2025; phosphorus jumped from 67% to 92% with a model update

Source. Chesapeake Bay Program annual progress releases, 2016–2026, including May 2, 2024, June 3, 2025 and August 6, 2026; EPA, 2025 Assessment (modeled).

Method. Each bar is the figure published at the time, on that year’s model; the bars are not one series. Bay-wide percentages for the 2017 and 2018 runs were not found and are left out. The 2015 and 2016 runs used the Phase 5 model.

SeriesPeriodValueUnitBasis
Nitrogen % of reductions achieved: Bay-wide (as published)201531percentmodeled
Nitrogen % of reductions achieved: Bay-wide (as published)201633percentmodeled
Nitrogen % of reductions achieved: Bay-wide (as published)201939percentmodeled
Nitrogen % of reductions achieved: Bay-wide (as published)202047percentmodeled
Nitrogen % of reductions achieved: Bay-wide (as published)202149percentmodeled
Nitrogen % of reductions achieved: Bay-wide (as published)202251percentmodeled
Nitrogen % of reductions achieved: Bay-wide (as published)202357percentmodeled
Nitrogen % of reductions achieved: Bay-wide (as published)202459percentmodeled
Nitrogen % of reductions achieved: Bay-wide (as published)202557percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)201581percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)201681percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)201949percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)202064percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)202164percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)202260percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)202367percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)202492percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)202590percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)201548percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)201657percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)2019100percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)2020100percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)2021100percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)2022100percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)2023100percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)2024100percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)2025100percentmodeled
Nitrogen % of 2025 interim target achieved: Pennsylvania (as published)202122percentmodeled
Nitrogen % of 2025 interim target achieved: Pennsylvania (as published)202329percentmodeled
Nitrogen % of 2025 interim target achieved: Pennsylvania (as published)202515percentmodeled
Nitrogen % of 2025 interim target: Bay-wide (published total basis)202458.6percentmodeled
Nitrogen % of 2025 interim target: Bay-wide (published total basis)202557.3percentmodeled

Download the-bay-scorecard-07-scores-by-model-run.csv

Download SVG · CSV. Data and chart licensed CC BY 4.0.