From Study XXI, Exhibit 1

In the 2025 model run the watershed had made 57% of the required nitrogen reduction, 90% of the phosphorus and 100% of the sediment

Source. EPA, 2025 Assessment of the Chesapeake Bay Program partnership’s progress toward the 2025 water quality goal (August 13, 2026); Chesapeake Bay Program, 2025 Modeled Load Reduction Indicator workbook (modeled).

Method. Percent achieved = (2009 load − 2025 load) ÷ (2009 load − 2025 interim target), capped at 100%. Phase 6 watershed model with average hydrology. EPA’s text prints the 2025 phosphorus load as 12.8 million lb, which is the target; the Bay Program release and workbook give 13.2.

SeriesPeriodValueUnitBasis
Nitrogen % of reductions achieved: Bay-wide (as published)202557percentmodeled
Phosphorus % of reductions achieved: Bay-wide (as published)202590percentmodeled
Sediment % of reductions achieved: Bay-wide (as published)2025100percentmodeled
Nitrogen: total simulated load to the Bay (published)2009297.128million lb/yrmodeled
Nitrogen: total simulated load to the Bay (published)2025252.688million lb/yrmodeled
Nitrogen: 2025 interim target w/ CEC (total Bay)2025 target219.546million lb/yrmodeled
Phosphorus: 2025 interim target w/ CEC (total Bay)2025 target12.781million lb/yrmodeled
Sediment: 2025 interim target w/ CEC (total Bay)2025 target18,587.026million lb/yrmodeled
Phosphorus: total load to the Bay200916.747million lb/yrmodeled
Phosphorus: all five land-based sectors (equals total; no tidal deposition term)202513.16million lb/yrmodeled
Sediment: total load to the Bay200918,830million lb/yrmodeled
Sediment: total load to the Bay202517,555million lb/yrmodeled

Download the-bay-scorecard-01-scorecard-2025.csv

Download SVG · CSV. Data and chart licensed CC BY 4.0.