In the 2025 model run the watershed had made 57% of the required nitrogen reduction, 90% of the phosphorus and 100% of the sediment
Source. EPA, 2025 Assessment of the Chesapeake Bay Program partnership’s progress toward the 2025 water quality goal (August 13, 2026); Chesapeake Bay Program, 2025 Modeled Load Reduction Indicator workbook (modeled).
Method. Percent achieved = (2009 load − 2025 load) ÷ (2009 load − 2025 interim target), capped at 100%. Phase 6 watershed model with average hydrology. EPA’s text prints the 2025 phosphorus load as 12.8 million lb, which is the target; the Bay Program release and workbook give 13.2.
| Series | Period | Value | Unit | Basis |
|---|---|---|---|---|
| Nitrogen % of reductions achieved: Bay-wide (as published) | 2025 | 57 | percent | modeled |
| Phosphorus % of reductions achieved: Bay-wide (as published) | 2025 | 90 | percent | modeled |
| Sediment % of reductions achieved: Bay-wide (as published) | 2025 | 100 | percent | modeled |
| Nitrogen: total simulated load to the Bay (published) | 2009 | 297.128 | million lb/yr | modeled |
| Nitrogen: total simulated load to the Bay (published) | 2025 | 252.688 | million lb/yr | modeled |
| Nitrogen: 2025 interim target w/ CEC (total Bay) | 2025 target | 219.546 | million lb/yr | modeled |
| Phosphorus: 2025 interim target w/ CEC (total Bay) | 2025 target | 12.781 | million lb/yr | modeled |
| Sediment: 2025 interim target w/ CEC (total Bay) | 2025 target | 18,587.026 | million lb/yr | modeled |
| Phosphorus: total load to the Bay | 2009 | 16.747 | million lb/yr | modeled |
| Phosphorus: all five land-based sectors (equals total; no tidal deposition term) | 2025 | 13.16 | million lb/yr | modeled |
| Sediment: total load to the Bay | 2009 | 18,830 | million lb/yr | modeled |
| Sediment: total load to the Bay | 2025 | 17,555 | million lb/yr | modeled |