From Study XXI, Exhibit 57

The seven largest municipal plants on the Delaware Estuary, 751 million gallons a day of capacity, reached secondary treatment between 1962 and 1987; 354 MGD (47%) was in place by 1980

Source. Albert, R.C. (1988), The historical context of water quality management for the Delaware Estuary, Estuaries 11(2), Table 2; running total derived.

Method. Sizes are design sizes as printed in 1988, not sizes at upgrade, and the table covers municipal plants over 20 MGD only. Trenton had secondary treatment from 1962 and was upgraded in 1983.

Year secondary treatment beganPlantDesign size (MGD)Cumulative (MGD)
1962Trenton, NJ2020
1974Wilmington, DE90110
1980DELCORA, PA44154
1980Philadelphia Southwest (S.W.), PA200354
1985Philadelphia Northeast (N.E.), PA210564
1986Philadelphia Southeast (S.E.), PA112676
1987Camden-Main, NJ75751

Download beyond-the-bay-03-delaware-plants-secondary.csv

Download SVG · CSV. Data and chart licensed CC BY 4.0.